<br />Item #Unit Price Item Total Unit Price Item Total
<br />1 $5,000.00 $100,000.00 $7035.49 $140,709.80
<br />2 $11,200.00 $22,400.00 $7721.52 $15,443.04
<br />3 $7,122.00 $106,830.00 $7,035.49 $105,532.35
<br />4 $8,732.00 $96,052.00 $7,035.49 $77,390.39
<br />5 $14,322.00 $14,322.00 $7,721.52 $7,721.52
<br />6 $17,500.00 $17,500.00 $11,696.20 $11,696.20
<br />7 $54.00 $28,350.00 $35.44 $18,606.00
<br />8 $19.00 $56,848.00 $23.10 $69,115.20
<br />9 $600.00 $1,200.00 $854.43 $1,708.86
<br />10 $700.00 $3,500.00 $746.84 $3,734.20
<br />11 $100.00 $400.00 $860.76 $3,443.04
<br />12 $15.00 $5,400.00 $44.67 $16,081.20
<br />13 $9,500.00 $9,500.00 $18987.34 $18,987.34
<br />14 $23,322.00 $23,322.00 $16202.53 $16,202.53
<br />$485,624.00 $506,371.67
<br />$17,000
<br />Annual Curb & Gutter Removal/Replacement, CIP 25509
<br />Villalobos & Associates
<br />P.O. Box 110004
<br />Campbell, CA 95011
<br />US
<br />Bidder Status: Valid
<br />Bid Items
<br />$120,000$6,000EACH20Remove and Replace (R/R) Case “___” (all
<br />cases) ADA Ramp
<br />Item Description Quantity Unit of
<br />Measure Unit Price Item Total
<br />Remove and Replace (R/R) Cases “___” (all
<br />cases) with Blended Transition ADA Ramp
<br />$120,000$8,000EACH15Remove and Replace (R/R) Cases “___” (all
<br />cases) with C1/C2 Blended Transition ADA
<br />$14,500$14,500EACH
<br />EACH
<br />1
<br />Total Bid Amount $ 610,000
<br />West Las Positas Blvd. and Foothill Road
<br />Intersection Ramps (2) Replacement per
<br />drawings A1-3 and A1-4
<br />1 LS $41,800
<br />$2,800
<br />LF525 $52,500$100
<br />$44,000LS1
<br />4 EACH $300 $1,200
<br />$41,800
<br />$44,000
<br />360 SF $20 $7,200
<br />$8,500EACH
<br />Install ADA Domes 5 EACH $1,100 $5,500
<br />Remove and Replace Curb and Gutter (C/G)
<br />Regardless of Type
<br />Complete all work associated with the
<br />installation of Median Island Vertical Curb on
<br />W. Las Positas Blvd. per drawing A1-1
<br />Remove and Replace (R/R) Sidewalk
<br />Grind Lip and Install ADA Domes 2 EACH $1,400
<br />2992 $68,816$23SF
<br />Bidder Status: Valid
<br />$104,500$9,500
<br />Bid Opening: 2:00PM, 01/22/2025
<br />Remove and Replace (R/R) Case “___” (all
<br />cases) Oversize (OS) ADA Ramp 2
<br />Engineer's Estimate
<br />11
<br />Traffic Control 1 LS $10,184 $10,184
<br />Corrected Bid Amount
<br />Grind Lip Flush at Existing Ramp
<br />Remove and Replace (R/R) Asphalt
<br />Concrete/Hot Mix Aspahlt (AC/HMA)
<br />Remove and Replace (R/R) Cases “___” (all
<br />cases) with Oversize (OS) Blended Transition
<br />ADA Ramp
<br />D'S General Engineering
<br />6536 Telegraph Ave, #205B
<br />Oakland, CA 94609
<br />US
<br />Page 1 of 4
<br />Page 39 of 56
|