<br />Item #Unit Price Item Total Unit Price Item Total Unit Price Item Total
<br />1 $6470.00 $129,400.00 $8800.00 $176,000.00 $8250.00 $165,000.00
<br />2 $10674.00 $21,348.00 $9600.00 $19,200.00 $9500.00 $19,000.00
<br />3 $8,673.33 $130,099.95 $9,000.00 $135,000.00 $8,750.00 $131,250.00
<br />4 $9,675.27 $106,427.97 $9,300.00 $102,300.00 $9,000.00 $99,000.00
<br />5 $12,334.00 $12,334.00 $12,000.00 $12,000.00 $8,650.00 $8,650.00
<br />6 $44,219.00 $44,219.00 $30,000.00 $30,000.00 $27,550.00 $27,550.00
<br />7 $119.00 $62,475.00 $75.00 $39,375.00 $85.00 $44,625.00
<br />8 $22.08 $66,063.36 $30.00 $89,760.00 $15.00 $44,880.00
<br />9 $1200.00 $2,400.00 $1160.00 $2,320.00 $2500.00 $5,000.00
<br />10 $780.00 $3,900.00 $590.00 $2,950.00 $1120.00 $5,600.00
<br />11 $400.00 $1,600.00 $580.00 $2,320.00 $650.00 $2,600.00
<br />12 $17.79 $6,404.40 $14.00 $5,040.00 $27.50 $9,900.00
<br />13 $28500.00 $28,500.00 $68465.00 $68,465.00 $100000.00 $100,000.00
<br />14 $61040.00 $61,040.00 $25000.00 $25,000.00 $48000.00 $48,000.00
<br />$676,211.68 $709,730.00 $711,055.00Total Bid Amount $610,000
<br />Traffic Control 1 LS $10,184 $10,184
<br />West Las Positas Blvd. and Foothill Road
<br />Intersection Ramps (2) Replacement per
<br />drawings A1-3 and A1-4
<br />1 LS $41,800 $41,800
<br />Grind Lip Flush at Existing Ramp 4 EACH $300 $1,200
<br />Remove and Replace (R/R) Asphalt
<br />Concrete/Hot Mix Aspahlt (AC/HMA)360 SF $20 $7,200
<br />Grind Lip and Install ADA Domes 2 EACH $1,400 $2,800
<br />Install ADA Domes 5 EACH $1,100 $5,500
<br />Remove and Replace Curb and Gutter (C/G)
<br />Regardless of Type 525 LF $100 $52,500
<br />Remove and Replace (R/R) Sidewalk 2992 SF $23 $68,816
<br />Remove and Replace (R/R) Cases “___” (all
<br />cases) with Oversize (OS) Blended
<br />Transition ADA Ramp
<br />1 EACH $14,500 $14,500
<br />Complete all work associated with the
<br />installation of Median Island Vertical Curb
<br />on W. Las Positas Blvd. per drawing A1-1
<br />1 LS $44,000 $44,000
<br />Remove and Replace (R/R) Cases “___” (all
<br />cases) with C1/C2 Blended Transition ADA 15 EACH $8,000 $120,000
<br />Remove and Replace (R/R) Cases “___” (all
<br />cases) with Blended Transition ADA Ramp 11 EACH $9,500 $104,500
<br />Remove and Replace (R/R) Case “___” (all
<br />cases) ADA Ramp 20 EACH $6,000 $120,000
<br />Remove and Replace (R/R) Case “___” (all
<br />cases) Oversize (OS) ADA Ramp 2 EACH $8,500 $17,000
<br />US US US
<br />Item Description Quantity Unit of
<br />Measure Unit Price Item Total
<br />Bid Items
<br />Annual Curb & Gutter Removal/Replacement, CIP 25509
<br />Bid Opening: 2:00PM, 01/22/2025 Engineer's Estimate
<br />Sposeto Engineering, Inc FBD Vanguard
<br />Construction, Inc.McKim Corporation
<br />Livermore, CA 94551 Livermore, CA 94550 Gilroy, CA 95020
<br />4558 Contractors Place 550 Greenville Road 8505 Church Street #1
<br />Bidder Status: Valid Bidder Status: Valid Bidder Status: Valid
<br />Page 4 of 4
<br />Page 42 of 56
|