Laserfiche WebLink
Phone:Phone:Phone:Phone: <br />JOB TITLE: City of Pleasanton, S-14 Lift Station DATE: <br />CLIENT:City of Pleasanton Public Works Department, Engineering Division <br />SM Saklaen <ssaklaen@cityofpleasantonca.gov> <br />Description of Services: Construction Services <br />Construction Services <br />Task Description <br />Principal <br />Engineer <br />Senior <br />Engineer <br />Senior <br />Designer <br />Junior <br />Designer <br />Associate <br />Designer cost per task <br />1 Bid Services 0 8 4 0 0 $2,640.00 <br />2A Meetings and PM 2 each 8 2 8 0 0 $4,020.00 <br />2B Respond to RFIs 3 each 2 3 12 3 0 $4,105.00 <br />2C Change Order Documents 1 each 2 2 8 4 0 $3,250.00 <br />2D Submittal Reviews 8 each 4 10 40 0 0 $11,280.00 <br />2E Factory Testing 1 days 1 2 8 0 0 $2,305.00 <br />2F Site Visit (by City)1 visits 1 2 7 0 0 $2,105.00 <br />2G Witness Testing 2 days 2 5 18 0 0 $5,240.00 <br />2H Inspection and Punchlist 1 revs 1 2 8 0 0 $2,305.00 <br />2I As Built Drawings 1 0 4 6 0 $2,095.00 <br />2J Arc Flash Labels (not included)0 0 0 0 0 $0.00 <br />2K Contingency 2 3 12 0 6 $4,390.00 <br />Travel Expense and Per Diem $1,050.00 <br />Subtotal Hours 24 39 129 13 6 <br />Hourly rate per discipline $245 $230 $200 $175 $135 <br />Total cost per discipline $5,880 $8,970 $25,800 $2,275 $810 $44,785.00 <br />Description of Services: Programming Services <br />Programming Services <br />Task Description <br />Principal <br />Engineer <br />Senior <br />Engineer <br />Senior <br />Designer <br />Junior <br />Designer <br />Associate <br />Designer cost per task <br />3A SCADA Manage Implementation 0 2 3 0 0 $1,060.00 <br />3B SCADA Database definition 0 2 6 0 0 $1,660.00 <br />3C SCADA Screen Graphic Design 0 7 21 0 0 $5,810.00 <br />3D SCADA Configure Alarm Notification 2 0 6 0 0 $1,690.00 <br />3E SCADA Configure Historian 0 2 6 0 0 $1,660.00 <br />3F SCADA Configure Networking (by City) 0 0 0 0 0 $0.00 <br />3G SCADA Startup and Testing 2 0 16 0 0 $3,690.00 <br />4A PLC Control Strategy 1 3 0 0 0 $935.00 <br />4B PLC Database definition 0 3 1 0 0 $890.00 <br />4C PLC Programming 7 28 7 0 0 $9,555.00 <br />4D PLC Factory Testing 1 3 3 0 0 $1,535.00 <br />4E PLC Startup and Testing 2 20 5 0 0 $6,090.00 <br />5A Operator Int. Screen Graphic Design 0 12 4 0 0 $3,560.00 <br />5B Operator Int. Database definition 0 3 1 0 0 $890.00 <br />5C Operator Int. Factory Testing 1 3 3 0 0 $1,535.00 <br />5D Operator Int. Startup and Testing 2 4 4 0 0 $2,210.00 <br />6 Electronic O&M Manual including backup 0 2 6 0 0 $1,660.00 <br />7 Operational Training 0 2 2 0 0 $860.00 <br />8 Warranty Support (1 yr. included)0 0 0 0 0 $0.00 <br />9 Contingency 0 8 8 0 0 $3,440.00 <br />Travel Expense and Per Diem $1,650.00 <br />Subtotal Hours 18 104 102 0 0 <br />Hourly rate per discipline $245 $230 $200 $175 $135 <br />Total cost per discipline $4,410 $23,920 $20,400 $0 $0 <br />Total Costs <br />Individual tasks cost are approximate and some cost shifting between tasks or disciplines may be necessary <br />Subtotal Costs <br />4 <br />4 <br />42 <br />7 <br />27 <br />16 <br />4 <br />We will coordinate, program, test, start-up, commission, and warranty the programming for this project. We have estimated the quantity of hours for <br />each task based on experience with similar projects. Occasionally, project circumstances require more attention than anticipated. If the project <br />requires more effort than allocated, additional budget may be required. <br />10 <br />8 <br />4 <br />0 <br />224 <br />23 <br />16 <br />FRISCH ENGINEERING, INC.FRISCH ENGINEERING, INC.FRISCH ENGINEERING, INC.FRISCH ENGINEERING, INC. <br />Electrical ContractorElectrical ContractorElectrical ContractorElectrical ContractorConsulting Electrical Engineers and ProgrammersConsulting Electrical Engineers and ProgrammersConsulting Electrical Engineers and ProgrammersConsulting Electrical Engineers and Programmers <br />13405 Folsom Blvd., Unit 60013405 Folsom Blvd., Unit 60013405 Folsom Blvd., Unit 60013405 Folsom Blvd., Unit 600 C-10 Lic #1025671C-10 Lic #1025671C-10 Lic #1025671C-10 Lic #1025671 <br />2/19/2025 <br />PROFESSIONAL ENGINEERING SERVICES COST ESTIMATE <br />Total hours <br />per task <br />7 <br />5 <br />8 <br />28 <br />$50,380.00 <br />11 <br />54 <br />11 <br />18 <br />12 <br />20 <br />16 <br />11 <br />8 <br />8 <br />0 <br />18 <br />Electrical Engineering Discipline <br />Folsom, CA 95630Folsom, CA 95630Folsom, CA 95630Folsom, CA 95630 (916) 353-1025(916) 353-1025(916) 353-1025(916) 353-1025 <br />Total hours <br />per task <br />We will perform the following services to the extent possible limited only by the budget of hours and costs. We have estimated the quantity of hours for <br />each task based on experience with similar projects or as directed. Occasionally, project circumstances require more attention than anticipated. If the <br />project requires more effort than allocated, additional budget may be required. <br />Electrical Engineering Discipline <br />10 <br />$95,165.00 <br />25 <br />Subtotal Costs <br />211 <br />0 <br />Pleasanton S-14 SLS Frisch 3-3 CM cost.xlsx Quote 2/19/2025 <br />Exhibit4A <br />Page 191 of 348