Laserfiche WebLink
November 8, 2024 <br />Page 23 <br /> <br />7357-013acp <br /> printed on recycled paper <br />are additional feasible mitigation measures which could reduce the Project’s GHG <br />emissions impacts. The DEIR fails to analyze additional measures which could <br />reduce the Project’s GHG emissions impacts to the greatest extent feasible.113 <br />CEQA requires the lead agency to adopt feasible mitigation measures that will <br />substantially lessen or avoid a project’s potentially significant environmental <br />impacts and describe those mitigation measures in the EIR.114 The lead agency <br />may not make the required CEQA findings regarding a project unless the <br />administrative record demonstrates that it has adopted all feasible mitigation to <br />reduce significant environmental impacts to the greatest extent feasible.115 SWAPE <br />provides a list of potential GHG mitigation measures that may apply to the <br />Project.116 The County must consider these and any other available feasible GHG <br />mitigation measures that can further reduce the Project’s significant GHG <br />emissions, and incorporate additional mitigation measures in a revised EIR <br />circulated for public review and comment. <br /> <br />Here, the Project results in significant GHG impacts from construction and <br />operation of the proposed apartments and road improvements.117 The DEIR <br />provides that “[p]rior to project operation, the proposed project would construct <br />approximately 1,000 feet of off-site sidewalk improvements and bicycle lane <br />improvements along Busch Road, which would connect to existing facilities on <br />Busch Road and Ironwood Drive.”118 In order to mitigate these GHG impacts, <br />SWAPE recommends BAAQMD recommended measures to reduce Project-related <br />GHG emissions.119 <br /> <br />The DEIR relies on Mitigation Measure MM TRANS-2b for transportation <br />impacts, but determines the impacts are still significant and unavoidable. MM <br />TRANS-2b provides that “Prior to project operation, the proposed project would <br />construct approximately 1,000 feet of off-site sidewalk improvements and bicycle <br />lane improvements along Busch Road, which would connect to existing facilities on <br />Busch Road and Ironwood Drive.”120 But the DEIR also provides that “as part of <br />the project’s design, the proposed project would construct approximately 1,000 feet <br />of sidewalk and bicycle facilities improvements to fill in the sidewalk gaps on the <br />north side of Busch Road between the project site and the existing sidewalk at <br /> <br />113 SWAPE Comments, p. 10. <br />114 PRC §§§ 21002, 21081(a) 21100(b)(3); CEQA Guidelines § 15126.4. <br />115 Covington v. Great Basin Unified Air Pollution Control Dist. (2019) 43 Cal.App.5th 867, 883. <br />116 SWAPE Comments, pp. 11-12. <br />117 SWAPE Comments, p. 12. <br />118 DEIR, p. ES-26. <br />119 SWAPE Comments, p. 12. <br />120 DEIR, p. 3.7-27.