My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
031825 REGULAR
>
SUPPLEMENTAL MATERIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 2:43:59 PM
Creation date
3/18/2025 2:36:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/18/2025
EXPIRATION DATE
3/18/2045
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> <br />Quality Act (“CEQA”) requires that such changes be justified by substantial evidence.2 After entering all <br />relevant data into the model, CalEEMod calculates the emissions from both construction and <br />operational phases, producing “output files.” These files outline the parameters used in the emissions <br />calculations and highlight any modifications made to the default values, along with justifications for <br />each change. <br />Upon review of the Project’s CalEEMod output files, provided in the Air Quality, Greenhouse Gas, and <br />Energy Supporting Information (“AQ & GHG Analysis”) as Appendix B to the DEIR, we identified several <br />model inputs that are inconsistent with the information presented in the DEIR. These discrepancies, <br />outlined below, suggest the Project’s construction emissions may be underestimated. A revised EIR <br />should be prepared to include an updated air quality analysis that adequately evaluates the impacts that <br />construction of the Project will have on local and regional air quality. <br />Unsubstantiated Changes to Individual Construction Phase Lengths <br />Review of the CalEEMod output files demonstrates that the “Alameda County Arroyo Lago Residential <br />Main Site” model includes changes to the default construction schedule (see excerpt below) (Appendix <br />B, pp. 95, 96). <br /> <br />As a result of these changes, the model includes the following construction schedule (see excerpt below) <br />(Appendix B, pp. 77): <br /> <br /> <br />2 “CalEEMod User’s Guide.” CAPCOA, May 2021, available at: https://www.aqmd.gov/caleemod/user's-guide, p. <br />13, 14.
The URL can be used to link to this page
Your browser does not support the video tag.