My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
031825 REGULAR
>
SUPPLEMENTAL MATERIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 2:43:59 PM
Creation date
3/18/2025 2:36:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/18/2025
EXPIRATION DATE
3/18/2045
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> <br /> <br />The DEIR concludes that the Project would result in a significant-and-unavoidable GHG impact, stating: <br />“The analysis showed that the proposed project would have a significant GHG impact and as <br />such would be considered to have cumulatively significant impact as well. Feasible and <br />enforceable mitigation with a nexus to the project’s impact have been identified under Impacts <br />GHG-1 and GHG-2; however, even with implementation of all feasible mitigation, project <br />impacts would be significant” (p. 3.7-28). <br />The DEIR claims that the Project aligns with BAAQMD requirements and design elements. According to <br />CEQA Guidelines § 15096(g)(2): <br />“When an updated EIR has been prepared for a project, the Responsible Agency shall not <br />approve the project as proposed if the agency finds any feasible alternative or feasible <br />mitigation measures within its powers that would substantially lessen or avoid any significant <br />effect the project would have on the environment.” <br />An impact can therefore only be labeled as significant-and-unavoidable after all available, feasible <br />mitigation measures are evaluated. While the DEIR incorporates MM GHG-1, GHG-2, and MM TRANS-2a <br />and TRANS-2b, there are additional measures that the DEIR fails to consider (p. 3.7-26, 3.7-27). To <br />reduce the Project’s GHG impacts to the maximum extent possible, additional feasible mitigation <br />measures should be incorporated, such as those suggested in the section of this letter titled “Feasible <br />Mitigation Measures Available to Reduce Emissions.”
The URL can be used to link to this page
Your browser does not support the video tag.