My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
031825 REGULAR
>
SUPPLEMENTAL MATERIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 2:43:59 PM
Creation date
3/18/2025 2:36:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/18/2025
EXPIRATION DATE
3/18/2045
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WILSON IHRIG <br />Arroyo Lago Residential Project <br />Review and Comment on Noise Report <br /> <br /> <br />Page 6 <br />Further, there is no discussion of baseline levels at the future Busch Road Senior Project site (Parcel B). The project cannot properly evaluate potential impacts at the site without establishing baseline levels. <br />The Project must conduct properly documented ambient measurements near all sensitive <br />receptors that capture the current baseline conditions during quiet period of the day and <br />night to determine impact of construction and operational noise. <br /> <br />Figure 2: Noise Measurements and Project Site <br />Conclusion The Project may result in potentially significant construction and operational noise impacts. The DEIR fails to include an analysis of noise from off-site infrastructure improvements and does not evaluate impacts from those operational sources at the Busch Road Senior Project, which is being permitted concurrently with the Project. The baseline measurements are not properly documented and may not represent existing levels at residences west of the site or at the Busch Road development. Please feel free to contact me with any questions on this information. Very truly yours, Ani Toncheva, Senior Consultant, WILSON IHRIG <br />PROJECT <br />SITE RESIDENCES <br />835 ft. <br />ST-1 <br />LT-1 / ST-3 <br />FIRE DEPT. <br />PARCEL B <br />(future <br />development) <br />ST-2
The URL can be used to link to this page
Your browser does not support the video tag.