My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
031825 REGULAR
>
SUPPLEMENTAL MATERIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 2:43:59 PM
Creation date
3/18/2025 2:36:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/18/2025
EXPIRATION DATE
3/18/2045
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WILSON IHRIG <br />Ani Toncheva – Page 2 <br /> <br /> <br /> <br />Columbia University Medical Center Medical and Graduate Education Building, New York, NY <br />Conducted baseline noise survey and performed attended noise measurements during preliminary <br />construction work. <br /> <br />Hudson Yards Tower C Foundations and Utilities, New York, NY Conducted a baseline noise <br />survey prior to construction work including a combination of long-term unattended and short-term <br />attended noise measurements. <br /> <br />PANYNJ Lincoln Tunnel Helix Rehabilitation, NJ Assisted in developing construction noise control <br />and mitigation plan and implementing a remote long-term noise monitoring program at three <br />locations. <br /> <br />MSK 74th Street, New York, NY Conducted baseline noise survey, assisted in developing <br />construction noise control and mitigation plan, and implemented a long-term noise monitoring <br />program at two locations. <br /> <br />NY MTA No. 7 Line Subway Extension Ventilation Facility Construction, New York, NY The <br />project involved mining and lining of two shafts and construction of a 2-story ventilation building. <br /> <br />NY MTA ESA/LIRR Grand Central Terminal Fit-Out, New York, NY Prepared the Contractor’s noise <br />and vibration control plan updates for fit-out work conducted underground at the Grand Central <br />Terminal Suburban Level. <br /> <br />San Francisco Planning Department, Alameda Street Wet Weather Tunnel and Folsom Area <br />Sewer Improvement, San Francisco, CA Noise and vibration analysis for Folsom Area stormwater <br />infrastructure improvements. <br /> <br />World Trade Center Vehicle Security Center, New York, NY Conducted baseline noise surveys, <br />assisted in developing construction noise control plans, and implementing a remote long-term <br />noise monitoring program. <br /> <br />50 Pine Street Condominiums, New York, NY <br />Project involved evaluating mechanical noise at residential dwelling units for NYC noise code <br /> <br />Uptown Newport, Newport Beach, CA <br />Evaluation of noise levels due to mechanical equipment at adjacent property.
The URL can be used to link to this page
Your browser does not support the video tag.