Laserfiche WebLink
LEGEND <br />-Existing Sewer Line <br />--Proposed Sewer Line <br />• • • Proposed Force Main <br />• Proposed Sewer Pump Station <br />PHASE -I <br />Sewer Master Plan Section-I <br />Trunk Line <br />Sewer Master Plan Sectlon-2 <br />Replacement Line <br />Tioga Ct. to Vineyard Ave. <br />Trunk Line <br />" <br />@ <br />® <br />© <br />® Foxbrough Pl. to Vineyard Ave. Connecting Line <br />PHASES -2/3 <br />® Trunk Line, Force Main and Pump Station <br />® Ruby Hill Reimbursement <br />!FIGURE VIII -21 <br />K <br />I <br />SCALE: 1 " -800' <br />SEWER SYSTEM COST COMPONENTS AND PHASING <br />98 <br />Page 145 of 749