Laserfiche WebLink
Table VIII-5 <br />Shared Sewer System Cost Allocation <br />Total Equivalent Percent of Total <br />Funding Contributors Dwelling Units (EDU's) Sewer System Cost <br />Contributing Development from Inside Specific Plan Area <br />• 189 new homes 189.0 81.1 <br />• 16 existing homes<l) 16.0 6.9 <br />• Elementary school 18.2 7.8 <br />• Community park 1.8 0.8 <br />Contributing Development from Outside Specific Plan Area <br />• Costas Property<2> 6.0 2.6 <br />• Fire Station 5 (Ruby Hmp> 2.0 0 .8 <br />Total 233 EDU's 100% <br />Shared sewer system cost per EDU is equal to 1 EDU + 233 total EDU's, or 0 .0043 x total shared sewer system cost. <br />Example: Shared sewer system cost per lot calculation: Lot 1 contains no existing homes and is planned for six new homes <br />(Table IV-1); therefore, six homes, or 6.0 EDU's x 0.0043 x total shared sewer system cost = shared water system cost for Lot 1. <br />The developer of Lot 1 must pay this amount at the time of final subdivision map recordation for this lot, or the issuance of the first <br />building permit for a habitable dwelling, whichever comes first. This amount is required to be paid regardless of how many homes <br />are ultimately developed on Lot 1. <br /><1> This excludes existing homes on Lots 8 and 15 where prior agreements with the City allow hook-up without further payment, and Lot 14 where the <br />existing caretaker's home will be repl aced with the community park. <br /><2> The Costas Property is located immediately north of the Plan Area but will benefit from the Plan Area sewer system improvements. Shared sewer <br />system cost obligations will be assigned to this property based upon an estimated six total homes, or 6.0 EDU's. <br /><3> Fire Station 5 (Ruby Hill) is located immediately east of the Plan Area but will benefit from the Plan Area sewer system improvements since it is <br />required to abandon its existing septic system and connect to the new trunk line planned in the realigned Vineyard Avenue . Shared sewer system cost <br />obligations will be assigned to the station based on an estimated average daily sewage generation of 440 gallons, or 2.0 EDU's. <br />100 <br />Page 147 of 749