Laserfiche WebLink
Table VIIl-8 <br />Shared Detention Basin System Cost Allocation <br />Total Equivalent Percent of Total Detention <br />Funding Contributors Dwelling Units (EDU's) Basin System Cost <br />Contributing Development from Inside Specific Plan Area <br />• 189 new homes 189.0 78 .1 <br />• Elementary school 43.6 18.0 <br />• Community park 3.3 1.4 <br />Contributing Development from Outside Specific Plan Area <br />• Costas Property<1> 6.0 2.5 <br />Total 241.9 EDU's 100% <br />Shared detention basin system cost per EDU is equal to 1 EDU -;-241.9 total EDU's, or 0 .0041 x total shared detention basin system <br />cost. <br />Example: Shared detention basin system cost per lot calculation -Lot 1 contains no existing homes and is planned for six new homes <br />(Table IV-1); therefore , six homes, or 6 .0 EDU's x 0 .0041 x total shared detention basin system cost= shared detention basin system <br />cost for Lot 1. The developer of Lot 1 must pay this amount at the time of final subdivision map recordation for this lot, or the <br />issuance of the first building permit for a habitable dwelling , whichever comes first. This amount is required to be paid regardless <br />of how many homes are ultimately developed on Lot 1. <br /><1> The Cost as Property is located immediately north of the Plan Area but will benefit from the Plan Area det ention basin system improvements. Sha red <br />detention basin system cost obligations will be assigned to this property based upon an estimated six total homes, or 6 .0 EDU 's. <br />106 <br />Page 153 of 749