My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 11:58:22 AM
Creation date
3/18/2025 2:49:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
749
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 of 18 <br />Infrastructure Financing <br />As described above, there are significant new infrastructure needs associated with <br />development of East Pleasanton properties. Design, construction, and maintenance of new <br />infrastructure should be considered holistically so that it can be most efficiently constructed <br />and managed into the future. For example, water and wastewater pipes should be sized to <br />carry all future anticipated flows, and adequate right-of-way for roadways should be provided <br />to accommodate all future needed lanes and intersection configurations. Developing a <br />coordinated phasing plan and a financing strategy to construct and infrastructure <br />improvements when they are needed and ensure they are adequately funded and maintained <br />over the long term will be important. <br /> <br />The public infrastructure demanded by East Pleasanton projects falls into two major <br />categories: <br />• Infrastructure within the boundaries of future subdivisions (on-site improvements), that <br />principally serves the future residents of those subdivisions. Such improvements <br />include internal project streets and sidewalks, water and sewer pipes connecting from <br />external pipelines to serve individual residences, storm drainage facilities, and in some <br />cases, parks or open space areas. <br />• Infrastructure located outside of the subdivision boundaries (off-site improvements), <br />which may be necessary to serve the project or provide adequate systemwide capacity, <br />but which also serve or benefit other projects in the vicinity, or the broader community. <br /> <br />The costs of installing on-site infrastructure to serve a project typically fall to the developer. <br />The City can also require the future residents of the subdivision to accept the long-term <br />maintenance responsibility for some or all of these improvements. While, in the past, the City <br />has accepted on-site infrastructure installed in a project as “public improvements” and <br />assumed the long-term maintenance responsibility, absorbing all of these costs and burdens <br />is now less feasible given available City resources, and there is greater interest in assigning <br />long-term maintenance responsibilities to the future homeowners or an HOA. <br /> <br />For off-site improvements which also generally fall to the developer(s) benefitting from the <br />improvements to install them, there is more complexity around how the construction and <br />maintenance is managed and funded. Where it is private property owners that mutually benefit <br />from new or expanded public infrastructure (as is the case for East Pleasanton <br />developments), it is desirable and beneficial for developers to coordinate and share in those <br />costs where possible. <br /> <br />The City may also be a participant in funding and financing a portion of costs for <br />improvements that provide a public benefit beyond just that for the new development. For East <br />Pleasanton, a key example is the construction of El Charro Road: although a portion of the <br />need for El Charro Road relates directly to the East Pleasanton projects, the new roadway will <br />also provide a more general circulation benefit, by alleviating cut-through traffic on Santa Rita <br />Road and existing congested intersections. <br /> <br />The City has certain funding available to help support these sorts of improvements (e.g., <br />Transportation Impact Fees) and can contribute funds for developer-installed improvements <br />that offer benefit beyond the requirements of a project, whether in the form of impact fee <br />Page 209 of 749
The URL can be used to link to this page
Your browser does not support the video tag.