My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 11:58:22 AM
Creation date
3/18/2025 2:49:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
749
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EAST LAKES APPLICATION PROCESS <br /> <br />The City of Pleasanton intends to process the East Lakes development applicant as described in <br />this document. <br />City Discretionary Entitlements <br />The City anticipates that required discretionary entitlements for the East Lakes project will include <br />the following: <br />• General Plan Amendment to designate the site Residential (specific designation(s) to align <br />with proposed density). <br />• Prezoning the site as Planned Unit Development District pursuant to Municipal Code <br />Chapter 18.68 <br />• Planned Unit Development (PUD) development plan pursuant to Municipal Code Section <br />18.68.110. <br />• Tentative subdivision map <br />• Resolution to initiate annexation proceedings <br />The City also expects to enter into a pre-annexation and development agreement with the applicant <br />for the project. <br /> CEQA Review <br />The City will serve as the lead agency and will complete environmental review of the project <br />consistent with the California Environmental Quality Act as follows: <br />• The City will prepare an environmental impact report (EIR) for the project. <br />• The applicant will provide complete and accurate project description information by the <br />dates specified in the project schedule. <br />• The City will select a CEQA consultant from among its prequalified list to prepare the EIR, <br />with applicant input based on proposed schedule and cost. The City will allow the applicant <br />to review and comment on consultant proposals before selection. <br />• The City will contract with and manage the work of the selected consultant. The City and <br />applicant will consult and coordinate, as appropriate and consistent with relevant CEQA <br />provisions, to ensure the timely and accurate preparation of draft and final p roject <br />materials. <br />• If needed, the applicant will provide complete and accurate supplemental information <br />needed for the CEQA analysis by dates mutually agreed upon by the City and the applicant. <br />• The City aims to publish a draft EIR for the project within six months of finalizing the project <br />description. <br /> <br />Schedule <br />The City aims to process entitlements for the project based on the schedule shown in Table 1. This <br />schedule assumes that: <br />• The applicant prepares and submits a project description for the EIR with this initial <br />application in March 2025 <br />ATTACHMENT 2 <br />Page 220 of 749
The URL can be used to link to this page
Your browser does not support the video tag.