My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
03-26
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:59:53 PM
Creation date
3/21/2025 1:58:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 13 <br /> <br />and utility plans submitted with the building permit plans or improvement plans and shall be <br />subject to the review and approval of the City Landscape Architect prior to their installation. <br />If above-ground, they shall be painted forest green or an equivalent dark-green color. <br />Screens shall consist of berms, walls, or landscaping satisfactorily integrated into the <br />landscape plan. Landscape screens shall include shrubbery designed by species and <br />planting density to establish a complete screen within 1 year from the date of planting. <br />Weather protection devices, such as measures to protect pipes from freezing, shall require <br />approval by the City Landscape Architect prior to use; at no time shall fabric or other <br />material not designed and/or intended for this purpose be wrapped around or otherwise <br />placed on these devices. Project Specific <br /> <br />54. MAINTENANCE: The applicant and all future owners of the property shall, at no expense to <br />the City, maintain all the landscaped areas related to the project in a healthful, attractive and <br />reasonably weed-free manner consistent with the approved landscape plan, for the duration <br />of the existence of the project. <br /> <br />55. SITE LIGHTING: All site lighting shall be designed for consistency with the International <br />Dark-Sky Association’s (IDA) Model Lighting Ordinance. This project site shall be considered <br />to be in an LZ-1 zone for design purposes. Lighting shall be subject to review and approval <br />by the City Landscape Architect prior to building permit issuance. Project Specific <br /> <br />Trees <br /> <br />56. TREE REPORT: The applicant shall comply with the recommendations of the tree report <br />prepared by John C. Meserve with Horticultural Associates, dated September 13, 2024, and <br />including the addendum dated November 23, 2024. No tree trimming or pruning other than <br />that specified in the tree report shall occur. The applicant shall arrange for the Project <br />Arborist to conduct a field inspection prior to building permit issuance to ensure all <br />recommendations have been properly implemented. The Project Arborist shall certify in <br />writing all recommendations have been followed. <br /> <br />57. TREE REMOVAL MITIGATION: Any trees approved to be removed by the City shall have its <br />full value paid into the City’s Urban Forestry Fund. A credit for replanting trees shall be as <br />follows: <br /> <br />a. $250 credit for a 15-gallon size replacement tree; <br />b. $500 credit for a 24-inch box size replacement tree; and <br />c. $1,000 credit for a 36-inch box size replacement tree. <br /> <br />58. TREE DISPOSITION PLAN: Provide a tree disposition plan that shows trees to remain, <br />trees to be removed, the value of each tree, the total value of the trees to remain and be <br />protected, and the total value of trees to be removed. The plan shall also include the tree <br />protection recommendations from the arborist report. Project Specific <br /> <br />59. TREE BOND: Any tree affected by development/construction must be protected per the <br />Municipal Code. The applicant shall post cash, letter of credit, or other security satisfactory <br />to the Director of Public Works, for all Heritage Trees and any other significant tree as <br />deemed by the City Landscape Architect. This bond or security will be for the value of the <br />tree(s), up to a maximum of $200,000, and shall be held for a minimum of 1 year following <br />acceptance of public improvements or completion of construction, whichever is later, and <br />shall be forfeited if the trees are destroyed or substantially damaged. An arborist shall be
The URL can be used to link to this page
Your browser does not support the video tag.