Laserfiche WebLink
<br />April 1, 2025 26 City of Pleasanton/GreenWaste Recovery, LLC <br />upon mutual agreement. Contractor shall deliver visitor presentations and provide up to twenty (20) tours of 985 <br />the Approved Recyclable Materials Processing Facility per Rate Year for organizations within the City , unless 986 <br />impractical due to safety concerns. Contractor shall make video tours of its Facility available for the City’s use 987 <br />with youth groups, given the Contractor’s prohibition of visitors under the age of eighteen (18). 988 <br />5.5 Delivery and Acceptance of Recyclable Materials 989 <br />A. General. On the Commencement Date and continuing throughout the Term, the City shall direct its Franchised 990 <br />Collector to Deliver All Recyclable Materials Collected in the City to the Approved Recyclable Materials 991 <br />Processing Facility , and Contractor shall commence Acceptance, Processing, Diversion, and Marketing of such 992 <br />materials on the Commencement Date. 993 <br />Contractor and the City agree to work cooperatively with the Franchised Collector to manage the Collection, 994 <br />Delivery, and Acceptance process in such a way that Loads Accepted by Contractor do not include an excessive 995 <br />amount of Contaminants that would cause Contractor to exceed the Approved Recyclable Materials 996 <br />Processing Facilities permitted Residue levels (for a particular month). 997 <br />B. City Obligation for Delivery. The City’s obligation to direct Delivery of Recyclable Materials Collected by its 998 <br />Franchised Collector in the City shall be contingent upon Contractor’s satisfaction of the terms and conditions 999 <br />of this Agreement including, but not limited to, the following requirements: 1000 <br />(1) Contractor. Contractor being able to fully perform Contractor’s Services. 1001 <br />(2) Site Permits and Approvals. Contractor and Approved Facilities being in compliance with Applicable 1002 <br />Law with respect to any and all Permits required for operations of Approved Facilities. 1003 <br />(3) Confirmation of Contractor’s Representations and Warranties. Representations and warranties made 1004 <br />by Contractor in Article 3 are true and correct in all material respects and there have been no 1005 <br />substantial changes in the financial position of Contractor. 1006 <br />(4) Adverse Changes in Contractor. Since the Effective Date, there shall not have occurred any material 1007 <br />change, financial or otherwise, that would adversely affect the ability of Contractor to perform 1008 <br />Contractor’s obligations hereunder or its obligations under any other agreement, contract or 1009 <br />instrument entered into or to be entered into by Contractor in connection with operation of the 1010 <br />Approved Facilities, Contractor’s obligations, the Services hereunder, and the transactions 1011 <br />contemplated hereby. 1012 <br />(5) No Default. Contractor not being in breach or default under this Agreement or any other agreement 1013 <br />with the City . 1014 <br />C. Acceptance by Contractor. Contractor shall diligently visually inspect Loads and periodically shall manually 1015 <br />characterize Loads to confirm that Accepted Recyclable Materials conform to the list of Recyclable Materials 1016 <br />in Exhibit D and do not contain Unpermitted Waste. Contractor shall implement Load-checking procedures in 1017 <br />a uniform and non-discriminating manner from Day-to-Day and for the City’s Recyclable Materials and 1018 <br />materials from other sources. Ownership of the Recyclable Materials transfers to Contractor pursuant to 1019 <br />Section 5.8 and Contractor cannot reject the Load thereafter. 1020 <br />D. Contaminated Load Monitoring and Rejection. The objective of the Load monitoring and notification process 1021 <br />is for Contractor to identify Loads of Recyclable Materials containing more than 15% Contamination. It is 1022 <br />Contractor’s responsibility to monitor the Delivered Loads of Recyclable Materials at the Approved Recyclable 1023 <br />Materials Processing Facility for Contamination in excess of 15% and to inform both Contractor and the City 1024