Laserfiche WebLink
<br />City of Pleasanton/____________ <br />DRAFT B-1 Processing Agreement, Exhibit B <br />EXHIBIT B <br />PERFOMANCE STANDARDS AND LIQUIDATED DAMAGES <br />Contractor may be assessed Liquidated Damages in the event Contractor fails to fulfill its obligations with regards to <br />the events listed in this Exhibit in accordance with the terms and conditions of the Agreement. Refer to Section 11.9 <br />of the Agreement for procedures for assessing Liquidated Damages. <br />Performance Area No. 1: Operations <br />1. Unauthorized Hours. For each occurrence of Contractor’s failure to operate the Approved <br />Facility during receiving hours specified in Section 6.2.A: $250.00 per hour (assess in 15- <br />minute increments) <br />2. Excessive Vehicle Turnaround Time. For each minute in excess of the Maximum Vehicle <br />Turnaround Time: $5.00 per Load, where the number of Loads shall be equal to the number <br />of Loads received during the week in which the Maximum Vehicle Turnaround Time was <br />exceeded and where the Maximum Vehicle Turnaround Time shall be determined for a <br />given week in which a week shall include the five (5) most recently completed Days of <br />Facility operations <br />3. Excessive Transfer Vehicle Loading. Exceeding the weight limitations as set forth in the State <br />of California Vehicle Code: $100.00 per incident <br />4. Invalid Driver License. Failure to have a vehicle driver properly licensed: $500 per incident or <br />$100 per Day, whichever is greater <br />5. Unauthorized Disposal. For each individual occurrence of Disposal rather than Processing <br />and Marketing of Acceptable Materials: $500.00 per Ton <br />6. Excessive Residue. Failure to meet the Residue level requirements for Processing of <br />Acceptable Materials pursuant to Section 5.5.D: $100 per Ton