Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Introduction <br /> <br /> <br /> 3 <br />1.2 - Summary of Results <br />As illustrated by the following Consistency Checklist, the proposed project is <br />consistent with the development density established in the Housing Element <br />Update and related zoning and has been found to be in conformance with <br />the analysis and conclusions of the Housing Element Update FEIR and is <br />exempt from further environmental review. This determination is based on the <br />following criteria pursuant to CEQA Guidelines Section 15183: <br />1. There are no new significant effects peculiar to the proposed project or <br />its site that were not analyzed as significant effects in the Housing <br />Element Update FEIR; <br />2. There are no new significant off-site or cumulative impacts that were <br />not analyzed in the Element Update FEIR, and <br />3. There are no previously significant effects which, as a result of <br />substantial new information was not known when the Housing Element <br />Update FEIR was certified, are determined to have a more severe <br />adverse impact than discussed in the Housing Element Update FEIR. <br /> <br />The following mitigation measures identified in the Housing Element Update <br />FEIR are applicable to the proposed project, as described in each <br />environmental topic: <br />• Mitigation Measure (MM) AIR-1a <br />• MM AIR-1b <br />• MM BIO-1 <br />• MM GEO-6 <br />• MM TRANS-2 <br /> <br />For the reasons set forth herein as well as in the attached appendices, this <br />evaluation concludes that the proposed project qualifies for a mandatory <br />streamlining exemption from additional environmental review under Section <br />15183 because it is consistent with the development density and land use <br />characteristics established by the City in its Housing Element Update and <br />related zoning, as analyzed by the Housing Element Update FEIR. Further, the <br />Housing Element Update FEIR adequately anticipated and described the <br />impacts of the proposed project, identified applicable feasible mitigation <br />measures necessary to reduce project-specific impacts, and the proposed <br />project would be required to implement these mitigation measures.