My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />108 <br />reliance on fossil fuel energy resources. Various strategies contained in the <br />CAP 2.0 would further reduce energy consumption and reliance on fossil fuel <br />energy resources. <br />Development consistent with the Housing Element Update is consistent with <br />the increasing reliance on renewable energy sources criterion for the <br />following reasons. New construction would be designed and constructed <br />consistent with the State’s Title 24 Building Energy Efficiency Standards and <br />would be required to incorporate a series of renewable energy design and <br />energy efficiency features. Additionally, the CAP 2.0 contains several <br />measures which would further increase reliance on renewable energy <br />resources. <br />For these reasons, the Housing Element Update FEIR concluded that energy <br />consumption associated with development consistent with the Housing <br />Element Update would not be wasteful, inefficient, or unnecessary, consistent <br />with the energy considerations contained in CEQA Guidelines Appendix F, <br />and this impact would be less than significant. <br />Proposed Project Analysis and Conclusion <br />During construction, the proposed project would be required to comply with <br />standards for new construction established by the State and BAAQMD and <br />development standards in the California Energy Code, CALGreen, the <br />Municipal Code, and other applicable federal, State, and local laws. <br />The proposed project would be consistent with the City's CAP 2.0 strategies <br />for renewable energy and energy efficiency. The proposed project would be <br />all electric and would not include natural gas plumbing. In addition, the <br />proposed project would include solar installation that meets the power needs <br />of the proposed project and an energy storage system with battery storage. <br />Thus, the proposed project would decrease overall per capita energy <br />consumption. Furthermore, the proposed project would be designed and <br />constructed consistent with the State’s Title 24 Building Energy Efficiency <br />Standards and would be required to incorporate a series of renewable <br />energy design and energy efficiency features. The proposed project would <br />not result in wasteful, inefficient, or unnecessary consumption of energy <br />resources or conflict with the CAP 2.0's plan for renewable energy or energy <br />efficiency. <br />Therefore, there are no environmental effects that are peculiar to the <br />proposed project. The proposed project would not result in a new or more
The URL can be used to link to this page
Your browser does not support the video tag.