My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />142 <br />If a potential site for rezoning is suspected to contain hazardous <br />materials, prior to building permits, the City shall ensure that <br />each project applicant retain a qualified environmental <br />consulting firm to prepare a Phase I Environmental Site <br />Assessment (Phase I ESA) in accordance with the American <br />Society for Testing and Materials (ASTM) Standards in effect at <br />the time of request of issuance of grading or building permits, <br />whichever is sooner, which would ensure the City is aware of any <br />hazardous materials on-site. The Phase I ESA shall determine the <br />presence of Recognized Environmental Conditions (RECs) and <br />state whether further investigation is recommended (e.g., <br />preparation of a Phase II ESA, if applicable). Prior to receiving a <br />certificate of occupancy, project applicants shall provide <br />documentation from any overseeing agency (e.g., Alameda <br />County Environmental Health [ACEH], Department of Toxic <br />Substances Control [DTSC], or Regional Water Quality Control <br />Board [RWQCB]) to the Community Development Department, <br />Planning Division that sites with identified contamination have <br />been remediated to levels where no threat to human health or <br />the environmental remains for the proposed uses. <br />Mitigation Measures for the Proposed Project <br />None. MM HAZ-2 has been fully implemented with the DTSC’s approval of the <br />RA Completion Report, as described above.
The URL can be used to link to this page
Your browser does not support the video tag.