My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 181 <br />d) Result in substantial adverse physical impacts associated with the provision of new <br />or physically altered governmental facilities, need for new or physically altered <br />governmental facilities, the construction of which could cause significant <br />environmental impacts, in order to maintain acceptable service ratios, response <br />times or other performance objectives for library facilities? <br />e) Result in substantial adverse physical impacts associated with the provision of new <br />or physically altered governmental facilities, need for new or physically altered <br />governmental facilities, the construction of which could cause significant <br />environmental impacts, in order to maintain acceptable service ratios, response <br />times or other performance objectives for other public services? <br />Summary of Housing Element Update FEIR <br />Fire Protection Services <br />The Housing Element Update FEIR indicated that development consistent <br />with the Housing Element Update could result in an increased demand for <br />fire protection services, and, as this demand increases, there may be a need <br />to increase staffing and equipment to maintain acceptable service ratios, <br />reflex times, and other performance standards. This would require existing fire <br />stations to be able to accommodate the additional staff and/or equipment. <br />If an existing fire station is at capacity for staffing, this could require an <br />expansion of an existing fire station or construction of a new fire station, the <br />construction of which could cause environmental impacts. The project- <br />specific environmental impacts of constructing new or expanded fire <br />protection facilities to support the growth anticipated as part of the Housing <br />Element Update cannot be determined at the time of certification of the <br />Housing Element Update FEIR because the designs of future new or <br />expanded facilities are not known. It can be expected that construction and <br />operation of future new or expanded fire protection facilities would have <br />similar impacts, as would construction and operation of other types of new <br />development consistent with the Housing Element Update. <br />The General Plan includes policies and programs to ensure that fire <br />protection services keep pace with new development. As the City receives <br />development applications for subsequent development consistent with the <br />Housing Element Update, those applications will be reviewed by the City for <br />compliance with the policies and programs of the General Plan and <br />Vineyard Avenue Corridor Specific Plan to ensure that fire protection services <br />keep pace with new development. In addition, the Municipal Code, which <br />implements the General Plan, would be reviewed when development <br />applications are received. Through implementation of the capital facilities <br />fee, developers would be responsible for payment of any improvements
The URL can be used to link to this page
Your browser does not support the video tag.