My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />238 <br />Development consistent with the Housing Element Update would not impair <br />an adopted emergency response plan or emergency evacuation plan <br />during construction or operation because policies and programs contained <br />within the General Plan establish requirements for preventive measures and <br />practices to minimize wildland fire hazards and maintain adequate <br />evacuation and access routes for vehicles in the event of an emergency. <br />Development consistent with the Housing Element Update would require <br />continued implementation of the Tri-Valley LHMP, the Comprehensive <br />Emergency Management Plan, and Chapters 19.36 and 20.24 of the <br />Municipal Code, and the California Fire Code. The LPFD would be included in <br />the development review process, to ensure adequate emergency vehicle <br />access and ensure that development is designed and operated in a manner <br />that minimizes fire hazards and maximizes the potential for responsive <br />emergency services. <br />Accordingly, the Housing Element Update FEIR concluded that compliance <br />with applicable federal, State, and local policies, as well as review of all new <br />structures by the Police and Fire Departments to ensure adequate <br />emergency access, would ensure that impacts are less than significant. <br />Proposed Project Analysis and Conclusion <br />As described in Section XVII, Transportation, the proposed project would <br />have adequate access for emergency vehicles. The proposed project is <br />located along Valley Avenue, which is a major arterial street and would <br />serve as an evacuation route to I-580 in the event of an emergency <br />evacuation. Furthermore, the proposed project would be required to <br />implement a construction traffic control/traffic management plan to ensure <br />that construction activities do not impair any emergency response plans or <br />emergency evacuation plans. <br />The proposed project would be required to comply with applicable goals <br />and policies from the Public Safety Element of the General Plan. In addition, <br />the proposed project would also not interfere with guidelines set forth in the <br />Pleasanton Comprehensive Emergency Management Plan, Alameda <br />County Disaster Plan for Tri-Valley LHMP, Chapters 19.36 and 20.24 of the <br />Municipal Code, and the California Fire Code. The proposed project would <br />undergo review by the LPFD to ensure adequate emergency access. <br />Therefore, there are no environmental effects that are peculiar to the <br />proposed project. The proposed project would not result in a new or more <br />severe adverse impact that was not previously identified in the Housing <br />Element Update FEIR.
The URL can be used to link to this page
Your browser does not support the video tag.