Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />246 <br />training and archaeological monitoring during clearing and grubbing. With <br />respect to biological resources, the proposed project has already included <br />the preparation of a BRA in compliance with MM BIO-1. Additionally, as <br />outlined in the BRA, the proposed project would be required to implement <br />COA BIO-1 through COA BIO-4, which would implement pre-construction <br />surveys and avoidance and minimization measures related to active bird <br />nests, special-status bats, riparian habitat, and protected trees. Therefore, <br />there are no environmental effects that are peculiar to the proposed project. <br />The proposed project would not result in a new or more severe adverse <br />impact that was not previously identified in the Housing Element Update FEIR. <br />b) Cumulatively Considerable Impacts <br />Does the project: Have impacts that are individually limited, but cumulatively <br />considerable? (“Cumulatively considerable” means that the <br />incremental effects of a project are considerable when viewed in <br />connection with the effects of past projects, the effects of other <br />current projects, and the effects of probable future projects)? <br />Summary of Housing Element Update FEIR <br />The Housing Element Update FEIR generally considered the greater Tri-Valley <br />area when considering the geographical scope of cumulative impacts and <br />concluded that cumulatively considerable impacts would occur related to <br />VMT and water supply. Development consistent with the Housing Element <br />Update would result in a significant and unavoidable cumulatively <br />considerable contribution to the existing cumulative VMT impact even with <br />mitigation incorporated (MM TRANS-2). With regard to water supply, due to <br />the potential decommissioning of the City’s groundwater supply wells, there <br />may not be enough water available to account for past, present, and future <br />development, including development consistent with the Housing Element <br />Update. Therefore, such development would result in a significant and <br />unavoidable cumulatively considerable contribution to water supply impact <br />and no mitigation is available to reduce impacts to a less than significant <br />level. <br />Proposed Project Analysis and Conclusion <br />Because the project considered herein is a single site, as compared to the <br />multiple sites considered in the Housing Element Update FEIR, the geographic <br />scope for the cumulative consideration of the proposed project is much <br />smaller than that of the Housing Element Update FEIR. Therefore, the <br />potential for cumulative contribution is smaller. Nonetheless, the proposed <br />project would contribute to the VMT and water supply cumulative impacts.