Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />248 <br />Lastly, the proposed project would not be required to implement MM NOI-1 <br />and MM NOI-2 because impacts would be less than significant without <br />mitigation as detailed in Section XIII, Noise, above. <br />With the implementation of these mitigation measures, there would be no <br />environmental effects that are peculiar to the proposed project. The <br />proposed project would not result in a new or more severe adverse impact <br />that was not previously identified in the Housing Element Update FEIR. <br />Mitigation Measures <br />Housing Element Update FEIR Mitigation Measures <br />MM AIR-1a and -1b, MM BIO-1, MM GEO-6, MM HAZ-2, MM NOI-1, MM NOI-2, <br />MM TRANS-2. <br />Mitigation Measures for the Proposed Project <br />Implement MM AIR-1a, MM AIR-1b, MM BIO-1, MM GEO-6, and MM TRANS-2.