My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of PleasantonVillages at the Quarry Project <br />Mitigation Monitoring and Reporting Program Preface <br /> <br /> <br />FirstCarbon Solutions 1 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480028/MMRP/21480028 Villages at the Quarry MMRP.docx <br />PREFACE <br />Section 21081.6 of the California Environmental Quality Act (CEQA) and CEQA Guidelines Section <br />15097 require a Lead Agency to adopt a Mitigation Monitoring and Reporting Program (MMRP) <br />whenever it certifies an Environmental Impact Report (EIR) in conjunction with a project approval. <br />The purpose of the MMRP is to ensure compliance with the mitigation measures occurs during <br />project implementation. <br />Pursuant to CEQA Guidelines Public Resources Code Section 21000, et seq., an EIR was certified and <br />a MMRP was adopted by the City of Pleasanton (City) on January 26, 2023 (City of Pleasanton 2023- <br />2031 [6th Cycle] Housing Element Update Program Environmental Impact Report, State <br />Clearinghouse [SCH] No. 2022040091). <br />The Consistency Checklist prepared for the proposed Villages at the Quarry Project (proposed <br />project) concluded that project implementation would be consistent with the development <br />evaluated in the EIR and further identified relevant mitigation measures required by the EIR that are <br />applicable to the project. This project-specific MMRP documents how and when the relevant <br />mitigation measures adopted by the Lead Agency as part of the MMRP for the EIR, as well as certain <br />project-specific enforceable conditions of approval and/or refinements to related aspects of <br />implementation for some, will be implemented for the proposed project and ensures that potential <br />environmental impacts associated with the proposed project are consistent with the impact <br />conclusions set forth in the EIR as identified and explained more fully in the Consistency Checklist. <br />This document does not discuss those subjects that the environmental analysis demonstrates would <br />result in less than significant impacts and for which no applicable mitigation was proposed in the EIR. <br />Nor does it address mitigation measures in the EIR that are not applicable to the proposed project.
The URL can be used to link to this page
Your browser does not support the video tag.