My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton <br />Villages at the Quarry Project Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 3 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480028/MMRP/21480028 Villages at the Quarry MMRP.docx <br />Table 1: Villages at the Quarry Project Mitigation Monitoring and Reporting Program <br />Mitigation Measures Method of Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />III. Air Quality <br />MM AIR-1a: Prior to the issuance of a grading or building <br />permit, whichever is sooner, the project applicant for a <br />potential site for rezoning shall submit an air quality <br />construction plan detailing the proposed air quality <br />construction measures related to the project such as <br />construction phasing, construction equipment, and dust <br />control measures, and such plan shall be approved by the <br />Director of Community Development or designee. Air <br />quality construction measures shall include (1) Basic <br />Construction Mitigation Measures, as approved by the <br />Bay Area Air Quality Management District (BAAQMD) in <br />2017, or the then currently adopted guidelines and, (2) <br />where construction-related emissions would exceed the <br />applicable thresholds as demonstrated by a qualified <br />consultant documented pursuant to methodologies <br />considered acceptable at that time, Additional <br />Construction Mitigation Measures, as recommended by <br />the BAAQMD, shall be implemented to reduce emissions <br />to acceptable levels. The air quality construction plan <br />shall be included on all grading, utility, building, <br />landscaping, and improvement plans during all phases of <br />construction and for access roads, parking areas, and <br />staging areas at construction sites. <br />Based on project- <br />specific Air Quality and <br />Greenhouse Gas <br />Assessment (see Section <br />4.3, Air Quality, of the <br />Consistency Checklist), <br />the proposed project ’s <br />air quality construction <br />plan shall incorporate <br />Basic Construction <br />Mitigation Measures <br />from BAAQMD. <br />Incorporation into <br />project construction <br />documents, including all <br />grading, utility, building, <br />landscaping, and <br />improvement plans; the <br />City of Pleasanton <br />Building & Safety <br />Inspection Division shall <br />inspect the worksite <br />regularly to ensure the <br />mitigation measures are <br />implemented. <br />Prior to issuance of <br />grading or building <br />permit, whichever is <br />sooner; included in all <br />plans during all phases <br />of construction. <br />City of Pleasanton <br />Community <br />Development <br />Department: Director or <br />designee for plan <br />approval; Building and <br />Safety Inspection <br />Division for ongoing <br />monitoring. <br /> <br />MM AIR-1b: The following measures pertain to project <br />sites where residences would be located within distances <br />where the Bay Area Air Quality Management District <br />(BAAQMD) or the California Air Resources Board (ARB) <br />recommends not siting residential uses due to exposures <br />The proposed project <br />has fully complied with <br />this mitigation measure <br />via preparation of the <br />project-specific Air <br />The proposed project <br />has fully complied with <br />this mitigation measure <br />via preparation of the <br />project-specific Air <br />City of Pleasanton <br />Community <br />Development <br />Department, Planning <br />Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.