Laserfiche WebLink
City of Pleasanton <br />Villages at the Quarry Project Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 7 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480028/MMRP/21480028 Villages at the Quarry MMRP.docx <br />Mitigation Measures Method of Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />measures reducing potential impacts to a less than <br />significant level. These measures shall be included as <br />Conditions of Approval for the project and be <br />incorporated into building and grading permits issued for <br />demolition and construction. If a water feature is found to <br />be jurisdictional or potentially jurisdictional, the applicant <br />shall comply with the appropriate permitting process with <br />each agency claiming jurisdiction prior to disturbance of <br />the water feature. <br />The project applicant or sponsor shall ensure that, if <br />development of habitat occupied by special-status <br />species, migratory or nesting birds must occur as <br />determined by a qualified Biologist and/or Wetland <br />Regulatory Specialist, species impacts shall be avoided or <br />minimized, and, if required by a regulatory agency or the <br />CEQA process, loss of wildlife habitat or individual plants <br />shall be fully compensated on a site. If on-site mitigation <br />is not feasible in the City’s or regulatory agency’s <br />discretion, it shall occur within the City of Pleasanton <br />Planning Area whenever possible, with a priority given to <br />existing habitat mitigation banks. Habitat mitigation shall <br />be accompanied by a long-term management plan and <br />monitoring program prepared by a qualified Biologist and <br />include provisions for protection of mitigation lands in <br />perpetuity through the establishment of easements and <br />adequate funding for maintenance and monitoring; the <br />time frame for the funding shall be detailed in the long- <br />term management plan and monitoring program <br />completed prior to disturbance of occupied habitat. <br />A project-specific BRA has been prepared in accordance <br />with Housing Element Update FEIR MM BIO-1. As <br />required under Housing Element FEIR MM BIO-1, and in <br />accordance with the proposed project’s Consistency