My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
DDIAZ
Created:
4/22/2025 5:17 PM
Modified:
4/22/2025 5:17 PM
Text:
https://www.envirostor.dtsc.ca.gov/public/profile_report.asp?global_id=60003462
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />P23-0480 & Tract 8680, 3300 Busch Road Planning Commission <br />24 of 29 <br />Street and to reduce costs associated with the Project, the City Traffic Engineer recommends <br />that Busch Road be a two-lane roadway with a roundabout, with adequate ROW reserved to <br />accommodate a future four-lane roadway. <br />Some elements of the Busch Road construction are eligible for a credit of Traffic Impact Fee <br />(TIF), and if applicable, a reimbursement through a reimbursement agreement in accordance <br />with Chapter 3.26, specifically Sections 3.26.070 and 3.26.080 of the PMC. <br /> <br />School Impacts <br />Pursuant to State law, payment of school impact fees set by the state legislature is deemed <br />adequate mitigation for school-related impacts associated with new student generation. <br />Construction will not be allowed to start until Pleasanton Unified School District has advised <br />such agreement has been finalized with the project developer and required fees paid. <br /> <br />DTSC Removal Action Plan (RAW) <br />As the site has historically been used for sand/gravel pit operations, the applicant has engaged <br />with the State Department of Toxic Substance Control (DTSC) for site cleanup in preparation <br />of the proposed residential development. <br /> <br />Geosyntec Consultants, an environmental consulting firm, conducted remedial excavation <br />activities on the project site under the approved DTSC’s RAW during the month of February <br />2024. Soil sample test results indicate the site “… meets the DTSC-approved Removal Goals <br />for the Site, which are based on the conservative DTSC-screening levels (SLs) for residential <br />soil.” The Geosyntec report stated COC (Chemical of Concern) -containing soils have been <br />effectively removed to concentrations meeting the DTSC-approved Removal Goals. Therefore, <br />Geosyntec is requesting DTSC’s concurrence that no further action (NFA) is required, and the <br />Project Site is suitable for unrestricted land use.” <br /> <br />On September 5, 2024, DTSC issued a certificate letter stating the following: <br /> <br />DTSC determined that all appropriate response actions have been completed, that all acceptable <br />engineering practices were implemented and that no further removal/remedial action is <br />necessary. If a previously unidentified release or threatened release of hazardous substances is <br />discovered in the future, Square Mile Pleasanton, LLC shall notify DTSC within five calendar days <br />of discovery. Additional assessment, investigation or cleanup may be required. <br /> <br />Details of the investigation, report and certification can be found at DTSC’s website at: <br />https://www.envirostor.dtsc.ca.gov/public/profile_report.asp?global_id=60003462 <br /> <br />Inclusionary Zoning Ordinance (IZO) and Affordable Housing Agreement (AHA) <br />PMC Section 17.44.040(A) provides that (1) for all new multi-family rental residential projects <br />of 15 or more, at least 15 percent of the subject project’s dwelling units shall be affordable to <br />Very Low-Income Households, and/or Low-Income Households; and (2) for all new for sale <br />single-family home projects of 15 units or more, at least 20 percent of the subject project’s <br />dwelling units shall be affordable to Very Low-Income Households, Low-Income Households, <br />and/or Moderate-Income Households. Accordingly, for purposes of the 310 single-family <br />detached market-rate units in Villages 1, 2, and 3, the 20 percent requirement triggers an <br />obligation for a total of 62 IZO units. <br />
The URL can be used to link to this page
Your browser does not support the video tag.