My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />P23-0480 and TR8680 Planning Commission April 23, 2025 <br />Page 22 of 31 <br />§9.28.020. The City shall have the right to inspect the Project site for conditions that <br />violate the code standard in accordance with the City’s enforcement provisions set forth <br />in the Pleasanton Municipal Code. If a nuisance is found, the applicant shall immediately <br />submit a plan of correction upon notification of the same. Depending on the severity of <br />the nuisance and pursuant to applicable provisions in the Pleasanton Municipal Code, the <br />City may suspend all construction work until the condition is corrected. Any of the <br />following conditions shall be considered severe: Leaking chemicals that can cause <br />environmental damage; open excavations or any excavation deeper than 4 feet that lacks <br />proper shoring; unsecured materials that can fall to the ground causing damage or injury; <br />open or exposed utilities that could cause electrical shock or contamination of sewer, <br />potable water systems, groundwater wells, or storm drainage networks. If the applicant <br />fails to address the nuisance as directed by the City, the City shall have the right to enter <br />the Project site to effectuate the correction, with all costs paid by the applicant or levied <br />as a lien against the applicant’s property, as permitted under the Pleasanton Municipal <br />Code’s enforcement provisions. (Address this condition during construction.) <br /> <br />93. NOISE: Construction noise is regulated under Pleasanton Municipal Code Chapter 9.04. <br />Construction noise is prohibited outside of the hours of 8:00 am and 8:00 pm daily , <br />except Sundays and holidays when noise is prohibited outside the hours of 10:00 am and <br />6:00 pm. Noise is defined as a level exceeding 83 dBA at a distance of 25 feet or 86 dBA <br />at any point beyond the boundary of the property under construction. If the applicant fails <br />to address the noise as directed by the City, the City shall have the right to enter the <br />property to effectuate the correction, with all costs paid by the applicant or levied as a lien <br />against the applicant’s property. As set forth in the Pleasanton Municipal Code, <br />exceptions to these regulations require a special permit granted by the City for <br />circumstances when strict compliance would be impractical or unreasonable, and <br />contingent upon proper noticing to surrounding p roperty owners, that includes the dates <br />and times when noise levels will be exceeded and the specific reasons why an exception <br />to the regulation has been granted. (Address this condition during construction.) <br /> <br />94. DROUGHT RESTRICTIONS: If the City Council declares a water shortage emergency <br />due to a drought during a time when this development is under construction, as described <br />in §9.30.010 et seq. of the Pleasanton Municipal Code, the applicant shall adhere to all <br />requirements and restrictions set forth in Pleasanton Municipal Code section 9.30. <br />Recycled water is available at designated locations within the City, subject to the <br />applicant’s receipt of a temporary hydrant meter from the Operations Service Center <br />located at 3333 Busch Road. The applicant is responsible for all water costs based on <br />current billing rates. (Address this condition prior to acceptance of improvements.) <br /> <br />95. GEOTECHNICAL FINAL REPORT: At the conclusion of construction, the applicant shall <br />submit to the City a final report from the Geotechnical Engineer or Certified Engineering <br />Geologist testifying to the successful completion of all material testing and/or observation <br />work performed. The final report shall provide assurance that all recommendations have <br />been strictly followed. The applicant shall bear all costs associated with this condition. <br />(Address this condition during construction.) <br /> <br />96. DAMAGE TO EXISTING PUBLIC OR PRIVATE IMPROVEMENTS: The applicant shall <br />repair damage to existing public or private improvements on and near the Project site and
The URL can be used to link to this page
Your browser does not support the video tag.