My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />P23-0480 and TR8680 Planning Commission April 23, 2025 <br />Page 26 of 31 <br />118. FINAL INSPECTION: Prior to request for final inspection, all access roads, on -site <br />access and fire hydrants shall be provided. All fire hydrants shall be accepted, inspected <br />and tested to applicable City Standards. <br /> <br />LANDSCAPE ARCHITECTURE DIVISION – 925-931-5672 <br /> <br />Landscaping <br /> <br />119. LANDSCAPING: Detailed landscape and irrigation plans encompassing all planting <br />areas, both on-site and off-site, shall be included in the building permit plans. All plans <br />shall be prepared by a licensed landscape architect and shall be in compliance with t he <br />Project Plans and shall provide the species, location, size, quantities, and spacing of all <br />plants. Minimum plant sizes are 1-gallon containers for ground cover, a mix of 1- and 5- <br />gallon containers for shrubs, and 15-gallon containers for trees. Plant species shall be of <br />a drought-tolerant nature and the irrigation design shall utilize low-volume drip, bubbler, <br />or other water conserving irrigation systems to the maximum extent feasible. The <br />drawings shall be subject to the review and approval of the City Landscape Architect prior <br />to building permit issuance. <br /> <br />120. WATER EFFICIENT LANDSCAPE ORDINANCE (WELO): The Project shall comply with <br />the City of Pleasanton’s Water Efficient Landscape Ordinance (WELO) and Bay Friendly <br />Basics Landscape Checklist. The applicant shall submit a Landscape Documentation <br />Package in PDF format to the Landscape Architecture Division, which shall be subject to <br />review and approval by the City Landscape Architect to confirm compliance with the <br />Project Plans prior to building permit issuance. The Landscape Documentation Package <br />shall include: <br />a. Project Information; <br />b. Water Efficient Landscape Worksheet; <br />c. Soil management report; <br />d. Landscape design plan; <br />e. Irrigation design plan; and <br />f. Grading design plan. <br /> <br />121. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to final <br />inspection by the Building and Safety Division, the applicant’s landscape architect shall, <br />for each neighborhood within each phase, submit a Certificate of Completion Package in <br />PDF format to the Landscape Architecture Division for review and approval. The <br />Certificate of Completion Package shall include: <br />a. Project information sheet; <br />b. Certificate of installation according to the landscape documentation package; <br />c. Irrigation scheduling; <br />d. Schedule of irrigation, landscape and irrigation maintenance; <br />e. Landscape irrigation audit report; and <br />f. Soil management report (if not previously submitted). <br /> <br />122. LANDSCAPING INSTALLATION: Prior to building permit final for the subject building, all <br />landscaping associated with that building shall be installed as shown on the approved
The URL can be used to link to this page
Your browser does not support the video tag.