My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
041525 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 2:46:16 PM
Creation date
4/24/2025 10:12:52 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/15/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br />Construction Practices and Noticing <br />9. WORK HOURS: All demolition and construction activities, inspections, plan <br />checking, material delivery, staff assignment or coordination, etc., shall be <br />limited to the hours of 8 a.m. to 5 p.m., Monday through Saturday. No <br />construction shall be allowed on State or Federal Holidays or Sundays. The <br />Director of Community Development may allow earlier “start times” or later <br />“stop times” for specific construction activities, e.g., concrete pouring. All <br />construction equipment shall meet Department of Motor Vehicles (DMV) noise <br />standards and shall be equipped with muffling devices. Prior to construction, <br />the hours of construction shall be posted on site. <br />10. DISTURBANCE COORDINATOR: The applicant shall designate a <br />“disturbance coordinator” who shall be responsible for responding to any <br />complaints regarding construction noise, dust, construction parking, etc. The <br />coordinator (who may be an employee of the general contractor) shall <br />determine the cause of the complaint and shall require the implementation of <br />reasonable measures warranted to correct the problem. A telephone number <br />of the disturbance coordinator shall be posted on the construction site fence <br />and on the notification sent to neighbors adjacent to the site. The sign shall <br />also list an emergency after- hours contact number for the disturbance <br />coordinator, or designee. <br />Fees <br />11. FEES: The applicant shall pay any and all fees to which the property may be <br />subject, prior to issuance of grading and/or building permits, or prior to <br />recordation of the final map, whichever is applicable. The type and amount of <br />the fees shall be those in effect at the time the permit is issued. <br />12. SCHOOL IMPACT FEES – COMMERCIAL: Prior to building permit issuance, <br />the applicant shall pay the required commercial development school impact <br />fee as prescribed by State law and as adopted by the Pleasanton Unified <br />School District (PUSD). <br />END <br />Page 202 of 223
The URL can be used to link to this page
Your browser does not support the video tag.