My WebLink
|
Help
|
About
|
Sign Out
ITEM 15 ATTACHMENT 1
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
ITEM 15 ATTACHMENT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:28:54 PM
Creation date
5/13/2025 4:12:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department Goals & <br />Objectives <br />• Work collaboratively with Stoneridge <br />Shopping Center property owners to <br />develop a comprehensive long-range <br />plan for redevelopment of the mall <br />• Process incoming residential project <br />applications under the Housing Sites <br />Conformance Analysis process, <br />including those on recently designated <br />housing element sites and in East <br />Pleasanton <br />• Incorporate the Economic Development <br />Division as part of the new Community <br />and Economic Development <br />Department to support an integrated <br />approach to permitting, zoning, and <br />land use <br />• Facilitate updates to processes and <br />municipal code changes that support <br />desired commercial investment in key <br />sectors <br />• Implement strategies identified in the <br />Economic Development Strategic Plan <br />to attract new retail to the city <br />• Continue to implement key programs of <br />CAP 2.0 including preparation of Fleet <br />Electrification Plan, Municipal Solar <br />Storage Project, and Electric Vehicle <br />Fast Charging Hubs at City facilities <br />• Advance pedestrian and bicycle <br />improvements by updating the <br />Pedestrian and Bicycle Master Plan and <br />supporting the high priority projects <br />along West Las Positas Boulevard, Santa <br />Rita Road, and near 1-580 <br />• Advance efforts to develop a planning <br />framework for East Pleasanton area and <br />address key issues around potential <br />annexation, infrastructure needs, and <br />development of various East Pleasanton <br />properties <br />• Develop a concept plan and coordinate <br />with BART to advance efforts to issue a <br />developer RFP for the east Dublin - <br />Pleasanton BART station <br />• Continue to support planning for the <br />Valley -Link project <br />• Continue to support implementation of <br />the 1-680 express lane projects <br />• Complete design improvements at <br />Sunol Boulevard and 1-680 Interchange <br />• Complete Accela SaaS Migration <br />(Cloud)/User Interface <br />Department <br />Accomplishments <br />Approved Stoneridge Mall Development <br />Agreement amendment, including <br />securing $200,000 in funding to help <br />support comprehensive planning <br />Continued implementation of Climate <br />Action Plan 2.0, including adoption of a <br />leaf -blower ordinance, installation of fast <br />electric vehicle charging stations and <br />initiating an RFP to perform <br />comprehensive municipal facility <br />updates related to reducing energy use <br />• Adopted a comprehensive <br />Development Impact Fee update, <br />establishing new Capital Facilities, <br />Transportation Impact, and Sewer and <br />Water Connection fees <br />• Adopted a comprehensive update of <br />the Inclusionary Zoning Ordinance, to <br />create more enforceable standards and <br />support construction of affordable <br />housing <br />• Entitled 255 units of residential <br />development and facilitated building <br />permit issuance for construction of the <br />305 -unit Avalon Bay residential <br />development <br />• Continued improvements to the Accela <br />online permit portal allowing for <br />simplified, on -demand trade, building, <br />and fire permit submittals <br />• Created a new retail development <br />program to attract and retain <br />businesses in targeted retail categories <br />• Assisted more than 400 Pleasanton <br />residents through housing programs <br />and provided support for unsheltered <br />Pleasanton residents <br />• Increased the affordable housing supply <br />with the construction of a 2-bed/2-bath <br />ADU for residents with <br />intellectual/developmental disabilities, <br />approval of nine affordable for -sale units <br />in the 3200 Hopyard project, and <br />approval of 18 age -restricted senior for <br />sale units in the Merritt project <br />• Installed and energized the Valley <br />Avenue at Northway Traffic Signal <br />• Completed traffic improvements to <br />support the Costco opening <br />• Continued design of W Las Positas Blvd <br />Multimodal Reconstruction Project, <br />including completion of 65 percent of <br />the plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.