Laserfiche WebLink
Department Goals & <br />Objectives <br />• Assess long-term water supply options to <br />ensure sustainable resources <br />• Address evolving regulatory standards <br />and implement new programs to meet <br />regulatory requirements for water, <br />wastewater, storm systems, and water <br />conservation <br />• Evaluate and update enterprise revenue <br />sources, including utility rates and <br />connection and user fees <br />• Update the Sewer System Master Plan to <br />reflect current and future operations and <br />identify system improvements and <br />necessary maintenance <br />• Identify key projects for the anticipated <br />10 -year Capital Improvement Plan (CIP) <br />• Deliver Capital Improvement Projects on <br />time and within budget allocations <br />• Apply conditions of approval for private <br />development projects, ensuring <br />compliance with grading, drainage, <br />landscape, utility, and roadway design <br />standards <br />• Review private development plans to <br />ensure alignment with state regulations, <br />city standards, and best engineering <br />practices <br />• Develop an Asset Management Plan to <br />address comprehensive long-term <br />planning for maintenance, renovation, <br />repair and/or replacement of <br />infrastructure and public facilities <br />• Inspect Capital Improvement and private <br />development projects for compliance <br />with approved plans and specifications <br />• Develop and adopt an Urban Forest <br />Master Plan <br />• Design solutions to repair and mitigate <br />damages caused by the 2023 winter <br />storms <br />• Improve city's diversion rate: percentage <br />of waste that is diverted from landfill or <br />incineration through recycling, <br />composting, or other means of recovery <br />• Finalize agreement for recyclable <br />materials processing and diversion <br />services in preparation for new statewide <br />recycling policy (SB 54) that mandates <br />higher levels of material recovery, and an <br />improved market for recycling services <br />Department <br />Accomplishments <br />• Updated City Standards and <br />Specifications <br />• Implemented the Capital Improvement <br />Program (CIP) Prioritization Program and <br />developed the FY26-30 CIP Budget <br />• Completed initial phases of the Asset <br />Management Plan <br />• Completed the Johnson Drive Economic <br />Development Zone Improvements on 1- <br />680 -Stoneridge Drive bridge and Johnson <br />Drive <br />• Upgraded water lines on Bernal Avenue, <br />Sunol Boulevard, and Stoneridge Drive as <br />part of Near -Term Water Infrastructure <br />improvements <br />• Constructed Hopyard Road and Owens <br />Drive Intersection improvements <br />• Upgraded Library lighting by replacing <br />lighting controls and installing LED lights <br />• Updated the Urban Forest Master Plan <br />and Tree Preservation Ordinance <br />• Completed Downtown LED Conversion <br />Project of 480 street and parking lot <br />lights <br />• Replaced the Roof at 157 Main Street, re- <br />modeled, replaced the HVAC System and <br />converted the Operation Service Center <br />(OSC) Sewer Building to new office space <br />for two PWD Divisions <br />• Completed Refuse Vehicle Street <br />Maintenance Cost Analysis and <br />implemented a Vehicle Impact Fee <br />• Achieved 98 percent SB 1383 compliance <br />rate for commercial and multi -family <br />garbage accounts <br />• Completed the Water System <br />Management Plan to ensure long-term <br />sustainability of the City's water program <br />• Completed the Sewer System <br />Management Plan audit and update as <br />required by the State Water Resources <br />Control Board <br />• Upgraded the utility billing web portal to <br />improve the customer service experience <br />with new features such as paperless <br />billing and additional payment options <br />with Auto Pay <br />