Laserfiche WebLink
The City of Pleasanton prepares a five-year Capital Improvement Plan (CIP) document that <br />is separate from the Operating Budget document, although the two are closely linked. The <br />CIP, as distinguished from the Operating Budget, is used as a planning tool for the City to <br />identify the capital improvement needs of the City and align those needs with the <br />appropriate timing and financing in a way that assures the most responsible and efficient <br />use of resources. City Council appropriates funds for the first two years of the five-year CIP. <br />The five-year CIP is reviewed bi-annually to enable the City Council to reassess projects in <br />the program and allocate funds. <br />A capital project typically involves the purchase or construction of major fixed assets such <br />as land, buildings and any permanent improvement including additions, replacements and <br />major alterations having a long life expectancy. Additionally, capital projects may apply to: <br />expenditures which take place over two or more years and require continuing <br />appropriations beyond a single fiscal year; systematic acquisitions over an extended period <br />of time or scheduled replacement or maintenance of specific elements of physical assets. <br />Generally, only those items costing $50,000 or more are considered as capital projects. For <br />informational purposes, capital projects are also referred to as capital facilities, CIP projects <br />and capital improvement projects. <br />For more information on the City's CIP, please refer to the FY 2025/26 - 2029/30 Capital <br />Improvement Program located on the City's website: www.cityofpleasantonca.gov. The <br />information provided in this section is from the original adopted FY 2025/26 -2029/30 CIP. <br />189 <br />