Laserfiche WebLink
Significant Non-recurring Capital Projects <br />The FY 2025/26 - 2029/30 CIP includes significant non-recurring projects and projects <br />identified through the Capital Improvement Program Process and Prioritization (CIPPP). A <br />project is considered significant if it has a measurable impact on the operating budget, or if <br />the project rarely occurs. Once completed, these projects will be added to the City's Repair <br />and Replacement Plan or Paving Plan to be amortized over the life of the asset. Future <br />budgets will include funding to cover the amortized replacement cost that will fund future <br />repair and replacement costs. The table below identifies the annual amortization rate, if <br />applicable. City staff does not expect these projects to impact other areas of the operating <br />budget or expect these proiects to result in additional savincas or revenues. <br />This project will focus on West Las Positas (WLP) <br />Boulevard pavement reconstruction. Phase 1 will be <br />Transportation <br />between Willow Road to Stoneridge Drive, <br />Transportation <br />reconstructing or replacing portions ofthe roadway and <br />project with annual <br />sidewalk. It will also include pedestrian, bicycle, and $17,020,000 <br />- $17,020,000 NA maintenance <br />transit improvements to bring the corridor up to an all <br />budgeted through <br />users and abilities design standards. This funding will <br />CIP <br />support the design and construction of this phase of the <br />project. <br />This project involves upgradingthe fire alarm system at <br />the Library. The system will remain active throughout <br />Transportation <br />construction. The scope of work includes replacing the <br />Replacement of <br />existing control panel and wiring to support the <br />budgeted through <br />upgraded system; upgrading detection and notification $750,000 <br />existing system, <br />$0 $750,000 NA <br />devices; and increasing the battery backup capacity to <br />change In existing <br />meet code requirements during power outages. <br />maintenance <br />Additionally, the scope Includes modifying the fire <br />Transportation <br />backflow assembly to bring it up to current standards. <br />project with annual <br />This project will focus on West Las Positas (WLP) <br />Boulevard between Owens Road and Santa Rita Road, <br />Transportation <br />specifically the design phase for the reconstruction or <br />project with annual <br />replacement of portions of the roadway and sidewalk. It <br />$1,000,000 <br />$0 $1,000,000 NA maintenance <br />will also include pedestrian, bicycle, and transit <br />budgeted through <br />improvements to bring the corridor up to an all users <br />CIP <br />and abilities design standard. This funding will support <br />the project design. <br />This project will generate the design for improvements <br />to the bicycle and pedestrian facilities connecting the <br />city of Pleasanton to the city of Dublin. As part of the <br />Transportation <br />2018 Pedestrian and Bicycle Master Plan, the City <br />$700,000 <br />project with annual <br />$0 $700,000 NA maintenance <br />developed bothshort- andlong-range designs for <br />budgeted through <br />improvements to the 1-580 overcrossings at Santa Rita <br />CIP <br />Road, Hacienda Road, and Hopyard Road. This funding <br />will support the project design. <br />This project will engage a consultant to update the <br />Transportation <br />existing 2015 citywide traffic model to current design <br />project with annual <br />standards and modeling techniques, projecting future $230,000 <br />$0 $230,000 NA maintenance <br />land use development as well as traffic and travel <br />budgeted through <br />patterns. <br />CIP <br />This project aims to convert approximately 2.4 acres of <br />nonfunctional turf across 11 locations within the city to <br />mulch or drought -tolerant plantings. It includes a design Parks project with <br />phase to modify the irrigation systems and create a <br />sustainable landscape design, followed by a construction $150,000 $950,000 $1,100,000 NA annual maintenance <br />phase to implement the turf reduction plan as outlined budgeted through <br />in the 2024 Citywide Turf Reduction Study. The project CIP <br />supports water conservation efforts and improves the <br />aesthetic and ecological value of these areas. <br />This program project involves resurfacing or replacing <br />various city park and property pathways and trails <br />identified as priorities in the Trails Master Plan or by <br />staff. The work will include crack sealing, spot repairs or <br />new trail surface. The following trails are scheduled for <br />updates over the next 5 years: 1. Sutter Gate Park, 2. <br />Marilyn Murphy Kane Trail, 3. Iron Horse Trail, 4. Arroyo <br />Mocho Trail (east of Santa Rita Road), 5. Bernal <br />Community Park's oak woodland trail. <br />Total <br />$95,000 $119,000 $214,000 <br />$19,945,000 $1,069,000 $21,014,000 <br />Parks project with <br />NA annual maintenance <br />budgeted through <br />CIP <br />$0 <br />