My WebLink
|
Help
|
About
|
Sign Out
ITEM 15 ATTACHMENT 1
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
ITEM 15 ATTACHMENT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:28:54 PM
Creation date
5/13/2025 4:12:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City shall establish and maintain a separate Water Expansion Fund and a Water Capital <br />Replacement Fund. <br />The Water Expansion Fund shall be funded primarily by connection fees, and will provide <br />for future expansion of the water system. <br />The City shall perform a water connection fee review at least bi-annually to ensure that <br />future water customers contribute fairly and equitably towards expansion projects <br />necessary to serve their needs. Reviews may be necessary within a shorter duration due to <br />changing conditions or facility needs. <br />The Water Capital Replacement Fund shall be funded primarily by replacement accruals <br />charged to existing users through the water rate structure. <br />To construct replacement and expansion facilities, the City may utilize other financing <br />alternatives such as debt financing, and seek other funding sources such as development <br />exactions. In addition to the specific financial policies stated above, the Water enterprise <br />funds are subject to the "Financial Policies of the City of Pleasanton" which were adopted <br />by Resolution No. 90-131. <br />226 <br />
The URL can be used to link to this page
Your browser does not support the video tag.