Laserfiche WebLink
Existing Sewer Projects <br />16245 <br />Sewer Capacity Evaluation <br />431 <br />$212,597 <br />- <br />$212,597 <br />In Design <br />432 <br />39,609 <br />- <br />39,609 <br />Emergency Power Improvements <br />21162 <br />Utility System <br />431 <br />750,000 <br />- <br />750,000 <br />In Design <br />22289 <br />Sewer System Management Plan <br />431 <br />507,823 <br />($300,000) <br />207,823 <br />In Design <br />Annual Sewer Collection System <br />23278 <br />Improvements <br />431 <br />1,392,500 <br />(1,392,500) <br />- <br />Cancelled <br />Sewer Station S-14 Electrical <br />24265 <br />Improvements <br />431 <br />650,638 <br />- <br />650,638 <br />Construction <br />Annual Sewer Collection System <br />25278 <br />Improvements <br />431 <br />1,500,000 <br />(1,500,000) <br />- <br />Cancelled <br />70 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />