My WebLink
|
Help
|
About
|
Sign Out
ITEM 15 ATTACHMENT 2 CIP
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
ITEM 15 ATTACHMENT 2 CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:24:23 PM
Creation date
5/13/2025 4:12:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing Storm Drain Projects <br />82 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />Sassafras Court Storm Drain Inter - <br />22484 <br />ceptor <br />441 <br />$596,875 <br />- <br />$596,875 <br />Design <br />23415 <br />Annual Storm Repair/ Replacement <br />441 <br />152,965 <br />($152,965) <br />- <br />Completed <br />Annual Installation of Trash Capture <br />23443 <br />Devices <br />441 <br />25,000 <br />- <br />25,000 <br />On Hold <br />24415 <br />Annual Storm Repair/ Replacement <br />441 <br />56,424 <br />(44,779) <br />11,645 <br />Completed <br />Sycamore Creek Storm Drain Im- <br />24662 <br />provements <br />441 <br />4,978,939 <br />- <br />4,978,939 <br />Design <br />East Vineyard Detention Pond Outfall <br />24676 <br />Repair <br />441 <br />607,195 <br />- <br />607,195 <br />Design <br />Oak Tree Farm Outfall and Channel <br />24677 <br />Stabilization <br />441 <br />628,492 <br />- <br />628,492 <br />Design <br />Augustin Bernal Trail Creek Crossing <br />24678 <br />Culverts and Retaining Wall <br />441 <br />1,293,890 <br />- <br />1,293,890 <br />Design <br />Park Pathway Restoration (Alviso <br />24679 <br />Adobe & Tawny Parks) <br />441 <br />150,000 <br />- <br />150,000 <br />Design <br />Sycamore Creek Storm Improve - <br />24680 <br />ments (Sycamore Road) <br />441 <br />5,000,000 <br />(4,000,000) <br />1,000,000 <br />Design <br />Annual Storm Repair/ Replacement <br />25415 <br />(Puri Court) <br />441 <br />1,750,000 <br />- <br />1,750,000 <br />Construction <br />Storm Water System Management <br />25659 <br />Plan <br />441 <br />500,000 <br />- <br />500,000 <br />Planning <br />Storm Drain Lift Station <br />25666 <br />Improvements <br />441 <br />40,000 <br />(40,000) <br />- <br />Cancelled <br />82 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.