Laserfiche WebLink
THE CITY OF <br />IMM 1 . m: m ��i�n M1 1 111 <br />PLEASANTON, <br />Annual Storm Repair & <br />Replacement <br />Project Number: FY615 <br />Department: <br />Project Phase: <br />Total Budget: <br />CIP Rating Score: <br />Project Description: <br />Public Works - <br />Utilities & Environmental Services <br />Design & Construction <br />N/A - Annual Project <br />Core <br />This project will provide erosion control and other <br />storm protection measures for City -owned property. <br />The project includes the repair, replacement, or in- <br />stallation of new storm facilities to protect property <br />from damage associated with storm activity, improve <br />storm water quality, and reduce the work required <br />to safely remove accumulated debris and silt. Work <br />would either be performed by City staff or through <br />contracted services. <br />Project Funding <br />Project Justification: <br />There is an ongoing need to perform repairs or re- <br />medial measures to prevent or limit storm damage <br />and improve storm water quality. Recent elevated <br />rain runoff flows have significantly impacted the <br />storm water system infrastructure. <br />Storm Drain Replacement 441 $200,000 $200,000 $200,000 $200,000 $200,000 <br />and Renovation <br />84 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />