My WebLink
|
Help
|
About
|
Sign Out
ITEM 15 ATTACHMENT 2 CIP
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
ITEM 15 ATTACHMENT 2 CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:24:23 PM
Creation date
5/13/2025 4:12:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br />IMM 1 . m: m ��i�n M1 1 111 <br />PLEASANTON, <br />Annual Storm Repair & <br />Replacement <br />Project Number: FY615 <br />Department: <br />Project Phase: <br />Total Budget: <br />CIP Rating Score: <br />Project Description: <br />Public Works - <br />Utilities & Environmental Services <br />Design & Construction <br />N/A - Annual Project <br />Core <br />This project will provide erosion control and other <br />storm protection measures for City -owned property. <br />The project includes the repair, replacement, or in- <br />stallation of new storm facilities to protect property <br />from damage associated with storm activity, improve <br />storm water quality, and reduce the work required <br />to safely remove accumulated debris and silt. Work <br />would either be performed by City staff or through <br />contracted services. <br />Project Funding <br />Project Justification: <br />There is an ongoing need to perform repairs or re- <br />medial measures to prevent or limit storm damage <br />and improve storm water quality. Recent elevated <br />rain runoff flows have significantly impacted the <br />storm water system infrastructure. <br />Storm Drain Replacement 441 $200,000 $200,000 $200,000 $200,000 $200,000 <br />and Renovation <br />84 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.