Laserfiche WebLink
THE CITY OF <br />W 1 . m: m ��i�n M1 1 111 <br />PLEASANTON, <br />Library Fire Alarm Upgrade <br />Project Number: 26386 <br />Department: <br />Project Phase: <br />Total Budget: <br />CIP Rating Score: <br />Project Description: <br />Library & Recreation <br />Design & Construction <br />$750,000 <br />96 <br />This project involves upgrading the fire alarm system <br />at the Library. The system will remain active throughout <br />construction. The scope of work includes replacing the <br />existing control panel and wiring to support the up- <br />graded system; upgrading detection and notification <br />devices; and increasing the battery backup capacity to <br />meet code requirements during power outages. Addi- <br />tionally, the scope includes modifying the fire backflow <br />assembly to bring it up to current standards. <br />Project Funding <br />Miscellaneous CIP 201 - $580,000 <br />- General Fund <br />Public Facilities 203 - $170,000 <br />Impact Fees <br />Project Justification: <br />The Library's fire alarm system, installed in the <br />1980s, has exceeded its operational life and has <br />become increasingly unreliable, due to obsolete <br />parts and technology. This poses a safety risk to <br />patrons and staff. Upgrading the system is essen- <br />tial to ensure safety, enhance emergency response, <br />and maintain compliance with current codes and <br />standards. This project supports the ONE Pleasan- <br />ton Strategic Plan goal of - Investing in Our Environ- <br />ment to invest Public Facilities. <br />City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 87 <br />