Laserfiche WebLink
Mr. Nelson Fialho/Mr. David Haglund Page 7 <br />Preliminary Issues Assessment of Potential Colocation of Maintenance Facilities <br />•Space in other city locations may be available to the City for relocating some of its <br />administrative operations. <br />•The District may be able to find other suitable property. <br />5.What future needs may the City have for expansion of staff, facilities and equipment at <br />the Operations Services Center due to population growth and build out? <br />Pleasanton, as part of the Bay Area economy, will continue to see residential and <br />commercial growth for the foreseeable future. While the City’s General Plan contemplates <br />“build-out”, there will be local decisions, such as a new general plans and area plan s, and <br />outside forces, such as new State laws that will enable and/or require additional <br />development in Pleasanton. Increases in the number of residents, employees and visitors <br />will generate increased demand for services – and likely the need for increased staff and <br />facilities space to support the increased demand. The City and the School District will need <br />to factor growth into their planning efforts. <br />6.How will parking needs be accommodated with increased uses at the Operations Services <br />Center? <br />The City’s data submittal indicated parking is currently inadequate at times. If the District <br />were to locate some functions at the site, its employees will also require parking. A specific <br />assessment of parking for City and District employees and parking required for visitors will <br />be required. The size of vehicles and type of equipment housed (e.g., fire vehicles and <br />buses) needs to be incorporated. Space for electric charging stations for use in the future also <br />needs to be considered. Consideration of alternative transportation options for employees <br />and visitors to the site could also be explored. <br />7.What changes in circulation may be needed to accommodate the safe movement of an <br />increased number of vehicles? <br />The Operations Services Center site will need to accommodate the circulation of traffic <br />entering and exiting the site for employees, visitors, deliveries and the movement of <br />equipment at the location. An analysis of the site’s ability to adequately support traffic <br />circulation of the functions intended to be co-located needs to be performed, including the <br />interaction between maintenance vehicles and the public. A more comprehensive planning <br />effort for the site and surrounding area may be warranted if the co -location plan advances. <br />8.What communication and power requirements would be needed for the increased <br />functions? <br />A communication and electrical power needs assessment will be required to identify the <br />number of phone lines and trucks, computer line capacity, wireless, radio and power <br />capacity needed to accommodate the co-located operation and the associated costs. If the <br />District’s data processing function is moved to the combined site, the cost of relocating the <br />district “head end” will also need to be considered.