My WebLink
|
Help
|
About
|
Sign Out
RES 2025032
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 10:36:27 AM
Creation date
7/7/2025 9:51:41 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/17/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 2025-032
DOCUMENT NAME
MOLLER RANCH
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> <br />City of Pleasanton <br />Landscape Maintenance District No. 1995-1, Moller Ranch Engineer’s Report, Fiscal Year 2025-26 <br />2 units @ $560.53 assessment per year (City parcel, savings of $9.53*2 County Collection Fee) <br /> <br />Notes to Estimate <br />i. Contingency to address maintenance that is not routine in nature, such as repair or replacement of broken <br />irrigation valves and lines or pruning/removing failed trees or tree limbs. This also includes mulch <br />replenishment to keep weeds down and anticipated lighting re pairs. <br />ii. Incidental and administration cost estimates include City staff hours dedicated to the administration of the <br />assessment (including staff time to bid work, monitor contracts and contractors, respond to residents’ <br />inquiries, etc.), county charges for inclusion of assessments on property tax bills, consultant fees for the <br />Proposition 218-compliant vote, and other incidental costs. <br />iii. At the time of this report a fund balance of approximately $258,000 remains for Landscape Maintenance <br />District 1995-1. The projected 2025-26 expenses, if necessary capital improvements were made, are higher <br />than the projected annual revenues. Therefore, the City will need to continue to hold on making those <br />improvements until the reserve fund balance is sufficient. Reserve/replacement funds are held in an interest- <br />bearing account until needed for repairs to the irrigation system, landscaping or other District features. <br />iv. The rate shown here is for a single-family home or its equivalent. For the definition of the term Single Family <br />Equivalent (SFE) and rates for other types of property, see the section titled, “Method of Assessment” and <br />the sections following it in this report. <br />v. The Act requires that proceeds from the assessments must be deposited into a special fund that has been <br />set up for the revenues and expenditures of the Maintenance District. Moreover, funds raised by the <br />assessment shall be used only for the purposes state d within this Report. Any balance remaining at the end <br />of the Fiscal Year, June 30, must be carried over to the next Fiscal Year. The District may also establish a <br />reserve fund for contingencies and special projects as well as a capital improvement fund fo r accumulating <br />funds for larger capital improvement projects or capital renovation needs. Any remaining balance would <br />either be placed in the reserve fund, the capital improvement fund, or would be used to reduce future years' <br />assessments. The Landscape Maintenance District 1995-1, Moller Ranch reserve/replacement funds are <br />held in an interest-bearing account until needed for repairs to the masonry walls, entry signage, irrigation <br />systems, lighting, landscaping or other District features.
The URL can be used to link to this page
Your browser does not support the video tag.