Laserfiche WebLink
City of Pleasanton <br />2025 Water Rate Study <br /> <br />Water Resources Economics <br />99 <br />Table 7-4: Proposed Water Connection Fees <br />Line Meter Size Capacity <br />(gpm) Meter Ratio Incremental <br />Fee <br />Buy-In <br />Fee <br />Total <br />Fee <br />1 5/8" 22 1.00 $2,825 $2,444 $5,269 <br />2 3/4" 32 1.45 $4,109 $3,555 $7,664 <br />3 1" 55 2.50 $7,063 $6,110 $13,173 <br />4 1 - 1/2" 100 4.55 $12,841 $11,109 $23,950 <br />5 2" 200 9.09 $25,682 $22,218 $47,900 <br />6 3" 500 22.73 $64,205 $55,545 $119,750 <br />7 4" 1,250 56.82 $160,511 $138,864 $299,375 <br />8 6" 2,500 113.64 $321,023 $277,727 $598,750 <br />9 8" 3,500 159.09 $449,432 $388,818 $838,250 <br />10 10" 5,500 250.00 $706,250 $611,000 $1,317,250 <br /> <br /> <br />7.5 CONNECTION FEE SURVEY <br />Figure 7-1 shows the current and proposed water connection fees relative to the connection fees of other <br />nearby agencies who also import water from Zone 7. Currently the City has the lowest connection fee <br />relative to other agencies, and after the proposed changes, the City’s connection fees remain the lowest. <br /> <br />Figure 7-1: Water Connection Fee Survey <br />