My WebLink
|
Help
|
About
|
Sign Out
ITEM 24 ATTACHMENT 2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
071525 REGULAR
>
ITEM 24 ATTACHMENT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 9:52:54 AM
Creation date
7/8/2025 9:51:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton <br />2025 Water Rate Study <br /> <br />Water Resources Economics <br />74 <br />CAPITAL COST COMPONENT ALLOCATION <br />Table 5-7 shows the capital cost allocation by cost component. The functionalized capital assets from Table 5-3 are allocated based on the cost <br />component allocation factors in Table 5-5. The capital allocation (Line 8) is derived from the total capital asset value by cost component (Line 7) <br />and represents the proportion of the Capital revenue requirement that will be allocated to each cost component. <br /> <br />Table 5-7: Recycled Capital Allocation by Cost Component <br />Line Capital Assets (RCLD) Meter Customer Water <br />Supply Delivery Rev. Offset General Total <br />1 Meter Maintenance $0 $0 $0 $0 $0 $0 $0 <br />2 Customer Service $0 $0 $0 $0 $0 $0 $0 <br />3 Water Supply $0 $0 $0 $0 $0 $0 $0 <br />4 T&D $0 $0 $0 $20,511,014 $0 $0 $20,511,014 <br />5 General $0 $0 $0 $0 $0 $0 $0 <br />6 Revenue Offset $0 $0 $0 $0 $0 $0 $0 <br />7 Total - Capital $0 $0 $0 $20,511,014 $0 $0 $20,511,014 <br />8 Capital Cost Allocation 0.0% 0.0% 0.0% 100.0% 0.0% 0.0% 100.0% <br /> <br />REVENUE OFFSET COST COMPONENT ALLOCATION <br />Table 5-8 shows the allocation of revenue offsets to each cost component. The functionalized revenue offsets from Table 5-4 are allocated <br />based on the cost component allocation factors in Table 5-5. The revenue offsets (Line 7) in each cost component will be applied to the total <br />revenue requirement based on these allocations. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.