My WebLink
|
Help
|
About
|
Sign Out
ITEM 24 ATTACHMENT 2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
071525 REGULAR
>
ITEM 24 ATTACHMENT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 9:52:54 AM
Creation date
7/8/2025 9:51:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton <br />2025 Water Rate Study <br /> <br />Water Resources Economics <br />77 <br />5.6 ALLOCATION TO COST COMPONENTS <br />PRELIMINARY COST-OF-SERVICE ALLOCATION AND GENERAL REALLOCATION <br />Table 5-10 shows the preliminary cost-of-service allocation prior to any adjustments and the adjusted cost-of-service allocations after the <br />General cost reallocation. The Operating costs (Line 1) are equal to the total Operating revenue requirements (Table 5-1, Line 17) allocated to <br />each cost component based on the Operating allocation (Table 5-6, Line 8). The Capital costs (Line 2) are equal to the total Capital revenue <br />requirements (Table 5-1, Line 17) allocated to each cost component based on the Capital allocation (Table 5-7, Line 8). The Revenue Offsets <br />(Line 3) are equal to the total Revenue Offset requirements (Table 5-1, Line 17) and are allocated based on the Revenue Offset allocation (Table <br />5-8, Line 7). Note that the total cost-of-service (Line 4) is equal to the total rate revenue requirement for FY 2025 (Table 5-1, Line 17). <br /> <br />The next step is to reallocate General costs (Line 5) based on the proportion of costs in each cost component (except General and Revenue <br />Offset, which is restricted to specific revenues only) in the preliminary allocation. The total revenue requirement (Line 6) stays the same after the <br />General cost reallocation. <br /> <br />Table 5-10: Recycled Cost-of-Service Allocation by Cost Component (Preliminary, General) <br />Line Revenue Requirement Meter Customer Water <br />Supply Delivery Rev. Offset General Total <br />1 Operating Costs $7,849 $4,288 $1,086,633 $336,285 $0 $433,194 $1,868,249 <br />2 Capital Costs $0 $0 $0 $434,895 $0 $0 $434,895 <br />3 Revenue Offsets $0 $0 $0 $0 ($9,500) $0 ($9,500) <br />4 Preliminary Allocation $7,849 $4,288 $1,086,633 $771,180 ($9,500) $433,194 $2,293,644 <br />5 General Cost Allocation $1,818 $993 $251,730 $178,652 $0 ($433,194) $0 <br />6 Adjusted for General $9,667 $5,282 $1,338,363 $949,832 ($9,500) $0 $2,293,644 <br /> <br />Table 5-11 shows the final cost-of-service allocation after reallocating delivery costs to meter, ensuring that the meter and customer unit costs <br />for recycled water match those for potable water. The rationale behind this reallocation is that the City incurs the same amount of meter <br />maintenance costs per equivalent meter and the same amount of customer service costs per bill regardless of service type. The cost-of-service <br />after general reallocation (Line 1) is from Table 5-10 (Line 6). <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.