Laserfiche WebLink
General Fund Reserves <br />The changes to General Fund Reserves are shown in Table 9 for the proposed two-year <br />budget. <br />Table 9: General Fund Projected Reserves <br />$30,863,884 <br />($52,152) <br />$30,811,732 <br />$471,871 $31,283,603 <br />$289,150 <br />($289,150) <br />- <br />- - <br />$379,428 <br />$379,428 <br />$379,428 <br />$500,000 <br />$500,000 <br />$500,000 <br />$19,974,282 <br />($1,000,000) <br />$18,974,282 <br />($2,000,000) $16,974,282 <br />$52,006,744 <br />($1,341,302) <br />$50,665,442 <br />($1,528,129) $49,137,313 <br />The projected FY 2025/26 unrestricted ending fund balance of $30.8 million is <br />approximately 19.9 percent of operating expenses in FY 2025/26. When all of the transfers to <br />other funds for various subsidies and contributions to the capital program are accounted <br />for, the projected FY 2025/26 unrestricted ending fund balance goes down to 18.8 percent. <br />For the FY 2026/27, $31.3 million represents approximately 19.4 percent of operating <br />expenditures and 18.3 percent when including all the transfers. <br />As part of the balancing strategy, some one-time funding resources are utilized. First, the <br />remaining COVID Response & Recovery reserve balance of $289,150 is planned to be used in <br />FY 2025/26. Second, based on the Council's direction from the March 4, 2025 meeting and <br />subsequent budget workshops, a total of $3.0 million from the Section 115 Pension Trust will <br />be utilized over the next two fiscal years. Third, $2.1 million will be withdrawn from the <br />Retiree Medical/Other Post -Employment Benefits (OPEB) Trust ($0.7 million in FY 2025/26 <br />and $1.4 million in FY 2026/27) to offset estimated contribution needs for each fiscal year. <br />Approximately $1.9 million of $2.1 million is for the General Fund. <br />Enterprise Funds <br />Water Fund <br />Revenues from water sales are expected to increase by 5.0 percent in FY 2025/26 and by an <br />additional 5.2 percent in FY 2026/27. These increases reflect baseline adjustments for both <br />fiscal years at this point. The City is conducting a water rate study with a rate increase <br />anticipated in January 2026. This phase of rate increase will help the Water Fund to address <br />the infrastructure funding gap and some of the critical projects identified in the Water <br />System Management Plan approved by the City Council in December 2024. The anticipated <br />rate increase will also help the Water Fund to restore and maintain the 35.0 percent reserve <br />target. At the end of FY 2025/26, the reserve is projected at 34.9 percent. It should be noted <br />that this reserve percentage is achieved by only transferring $0.1 million to the Water <br />Capital Fund in FY 2025/26, which is not enough to maintain and improve the existing <br />infrastructure. Without additional rate increases, this estimated reserve level is projected to <br />drop. <br />The rate study is scheduled to be completed in the fall. As such, numbers included in the FY <br />2025/26 and FY 2026/27 budget, summarized in Table 10 below, reflect estimates based on <br />preliminary analysis. Once the rate study is completed, any recommended budget <br />amendments, as necessary, and proposed rate adjustments will be presented to the City <br />Council for consideration. <br />The City currently purchases 100.0 percent of its water from Zone 7. The water purchase <br />costs are projected to increase by 3.8 percent in FY 2025/26 and 5.5 percent in FY 2026/27. <br />36 <br />