My WebLink
|
Help
|
About
|
Sign Out
RES 2025043
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 3:49:27 PM
Creation date
7/28/2025 2:38:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 2025-043
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
An increase in the annual assessment will be necessary to meet the maintenance <br />standards of the District into the future. The city can no longer subsidize staff <br />administration time or the consultant fees for a Proposition 218 -compliant vote. The <br />consultant fees for the Proposition 218 -compliant vote will cost approximately $36,000 <br />plus staff time and will need to come out of the reserve fund. Water costs, which require <br />a significant portion of the LIVID budget, increased thirty percent in calendar year 2024, <br />another twelve percent in 2025, and are projected to continue to increase in future years <br />to pay for necessary infrastructure and treatment costs. <br />Even with the restoration of the approved increased assessment amount, the city will be <br />forced to reduce maintenance and postpone facilities upgrades and tree pruning, <br />resulting in a continuing deterioration of the grounds and facilities, which may place the <br />district at risk to potential fines or litigation. To limit liability for the district, it will be <br />necessary for the city to continue to pursue a proposition 218 -compliant vote, incurring <br />significant consultant costs each time, until a sustainable assessment has been agreed <br />to by property owners. <br />For 2024-25 costs/revenues, see Figure 4 — FY 2024-25 Actual Costs and Revenues. <br />Engineer's Report and Proposed Assessments <br />Each year for which the assessments will be approved, the City Council must direct the <br />preparation of an Engineer's Report, budgets, and proposed assessments for the <br />upcoming fiscal year. After the Engineer's Report is completed, the City Council may <br />preliminarily approve the Engineer's Report and proposed assessments and establish <br />the date for a public hearing on the continuation of the assessments. This Report was <br />prepared pursuant to the direction of the City Council. <br />This Engineer's Report ("Report") was prepared to establish the budget for the <br />continued maintenance, improvements, and services ("Improvements") that would be <br />funded by the proposed fiscal year 2025-26 assessments, determine the benefits <br />received by property from the Improvements, and the method of assessment <br />apportionment to lots and parcels within the Maintenance District. This Report and the <br />proposed assessments have been made pursuant to the Landscaping and Lighting Act <br />of 1972, Part 2 of Division 15 of the California Streets and Highways Code ("Act") and <br />Article XIIID of the California Constitution ("Article"). <br />If the City Council approves this Engineer's Report and the proposed assessments by <br />resolution, a notice of public hearing must be published in a local paper at least 10 days <br />prior to the date of the public hearing. The resolution preliminarily approving the <br />Engineer's Report and establishing the date for a public hearing is used for this notice. <br />Following the minimum 10 -day period after publishing the notice, a public hearing is <br />held for the purpose of allowing public testimony about the proposed assessments. This <br />hearing is currently scheduled for July 15, 2025. At this hearing, the City Council would <br />City of Pleasanton <br />Landscape Maintenance District No. 1984-1, Ponderosa Engineer's Report, Fiscal Year 2025-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.