My WebLink
|
Help
|
About
|
Sign Out
RES 2025044
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 3:49:39 PM
Creation date
7/28/2025 2:41:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 2025-044
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />assessment. The residents expressed an interest in having more control on how the <br />money is spent and requested that the City provide additional information to them <br />regarding the formation of the Windsor Landscape Maintenance District. <br />On November 3, staff sent an email to the Windsor HOA property manager that defined <br />the maintenance responsibilities associated with the development and included the <br />formation documents for the development. After receiving the formation documents, the <br />HOA Board expressed their interest in partially taking over the maintenance <br />responsibilities of the LIVID rather than taking the assessment increase to a vote by the <br />homeowners. Staff worked with the HOA Board President to determine what that shared <br />maintenance would look like. On March 29, 2023, the Board submitted a letter stating <br />their commitment to take over the monthly maintenance of the planting and paying the <br />costs of water and on February 6, 2024, the HOA took over the monthly maintenance <br />and water payments. The Windsor LIVID retained the other maintenance <br />responsibilities/costs, including but not limited to irrigation repairs, soundwall repair, tree <br />pruning, etc. <br />Although the HOA accepted the costs for routine plant maintenance and water to help to <br />alleviate the fund balance deficit, it is not a permanent solution. An increase in the <br />annual assessment will be necessary to meet the maintenance standards of the District <br />in the future. The city can no longer subsidize staff administration time or the consultant <br />fees for a Proposition 218 -compliant vote. The consultant fees for the Proposition 218 - <br />compliant vote will cost approx. $36,000 and will come out of the reserve fund. Water <br />costs are not a factor for the Windsor LIVID since the HOA took over payment and that <br />will reduce the proposed assessment increase amount, but significant tree pruning and <br />capital improvement repair and replacement costs are substantial. <br />Additionally, Assembly Bill 1572, which was passed by the State Assembly on October <br />13, 2023, and relates to water use on lawns within the district, requires that no irrigation <br />be used on nonfunctional turf areas prior to January 1, 2028. The district has two areas <br />that are considered "nonfunctional turf' by the bill that will need to be removed and <br />replaced, one along Bernal Avenue and the other just on the other side of the entry wall <br />on Tapestry Way. The turf conversion is estimated to cost around $175,000 and will <br />require a loan or increase to assessments in 2027 to cover the costs. <br />The landscape will continue to decline below the necessary maintenance standards of <br />the district established by Ordinance 2458. This may place the district at risk of fines or <br />litigation. To limit liability for the district, it will be necessary for the city to continue to <br />pursue a proposition 218 -compliant vote, incurring significant consultant costs each <br />time, until a sustainable assessment has been agreed to by property owners. <br />If additional funding from a new or increased assessment is not implemented, the City <br />will be forced to continue to reduce maintenance and postpone facilities upgrades, <br />resulting in a continuing deterioration of the grounds and facilities. <br />For 2024-25 costs/revenues, see Figure 4 — FY 2024-25 Actual Costs and Revenues. <br />City of Pleasanton <br />Landscape Maintenance District No. 1993-1, Windsor Engineer's Report, Fiscal Year 2025-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.