Laserfiche WebLink
3 <br />replacement of plantings, irrigation systems, fencing, and other district improvements. <br />The equivalent of the $252.91 assessed last year in today's dollars, based on the <br />Consumer Price Index for California, is $513.25. The Engineer's Report projects a <br />shortage that will require the City to continue to reduce maintenance levels. <br />Water costs increased thirty percent in calendar year 2024, increased another twelve <br />percent in 2025, and are projected to continue to increase in future years to pay for <br />necessary infrastructure and treatment costs. The water has been turned off at the <br />Bonde Ranch LIVID because of the state of disrepair of the irrigation system so water <br />rate increases currently have a limited impact to the Bonde Ranch LIVID (there is still a <br />base monthly fee for the water meter). However, the rate increases will have a <br />significant impact if the irrigation system is restored. Turning off the water has led to a <br />lack of water on the plants and trees, which has caused a number of plants to die and <br />puts the health of the landscape more at risk and reduces the ability of the plants to <br />weather drought conditions. <br />Continued cuts in maintenance to pay for the increasing fire management and <br />necessary tree pruning/removal costs will lower the level of maintenance well below the <br />maintenance standards of the district established by Ordinance 1509. In addition, the <br />city can no longer continue to subsidize staff administration time or the consultant fees <br />for a Proposition 218 -compliant vote. The consultant fees for the Proposition 218 - <br />compliant vote will cost approx. $36,000 plus staff time and will need to come from the <br />reserve fund. <br />City staff began the process of potentially increasing the assessments for the Bonde <br />Ranch Landscape Maintenance District in early 2022 through a Proposition 218 <br />compliant voting procedure. However, the property owners that attended the <br />neighborhood outreach meeting on February 3, 2022, or communicated to staff via <br />phone or email expressed strong opposition to increasing the assessment. Staff placed <br />the pursuit of a sustainable assessment amount on hold at that time. <br />Even with the restoration of the approved assessment amount, the city will be forced to <br />reduce maintenance and postpone facilities upgrades and tree pruning, resulting in a <br />continuing deterioration of the grounds and facilities, which may place the district at risk <br />to potential fines or litigation. To limit liability for the district, it will be necessary for the <br />city to continue to pursue a proposition 218 -compliant vote, incurring significant <br />consultant costs each time, until a sustainable assessment has been agreed to by <br />property owners. <br />For 2024-25 costs/revenues, see Figure 4 — FY 2024-25 Actual Costs and Revenues. <br />Engineer's Report and Proposed Assessments <br />Each year for which the assessments will be approved, the City Council must direct the <br />preparation of an Engineer's Report, budgets, and proposed assessments for the <br />upcoming fiscal year. The city staff time to perform this work has been previously <br />City of Pleasanton <br />Landscape Maintenance District No. 1993-2, Bonde Ranch Engineer's Report, Fiscal Year 2025-26 <br />