Laserfiche WebLink
3 <br />Assessment revenues were lowered in 1999 and then again in 2000 and have remained <br />the same since then, however, over the years, operational costs and utility costs have <br />increased while the assessment revenues have remained the same. Raising the fiscal <br />year 2025-26 total assessment revenue, although a step in the right direction, will not be <br />sufficient to fund the maintenance of all common areas, including water costs, county <br />assessment fees, city administration fees, replacement of plantings, irrigation systems, <br />fencing, lighting, and other district improvements. The Engineer's Report projects that <br />the City will need to reduce landscape maintenance and necessary capital improvement <br />costs to remain below the assessments. <br />Over the years, operational costs and utility costs have increased, however the <br />assessment revenues have remained the same. The fiscal year 2025-26 total <br />assessment revenue will not be sufficient to fund the maintenance of all landscaped <br />areas, including water costs, county assessment fees, city administration fees, <br />replacement of plantings, irrigation systems, and other district improvements. The <br />Engineer's Report projects a shortage that will require the City to reduce maintenance. <br />An increase in the annual assessment will be necessary to meet the maintenance <br />standards of the District in the future. The city will be charging administrative time and <br />consultant fees for the Proposition 218 -compliant Engineer's Report, which will cost <br />approximately $9,000, plus staff time, and will need to be funded from the reserve fund. <br />Water costs increased thirty percent in calendar year 2024, another twelve percent in <br />2025, and are projected to continue to increase in future years to pay for necessary <br />infrastructure and treatment costs. <br />The water has been turned off at the Oak Tree Farm LIVID because of the state of <br />disrepair of the irrigation system so water rate increases have a limited impact to the <br />Oak Tree Farm LIVID, but standard water meter fees still apply and the rate increases <br />will have a significant impact if the irrigation system is restored. Continued cuts in <br />maintenance to pay for the increasing fire management, fence and lighting repair, and <br />necessary tree pruning/removal costs will lower the level of maintenance well below the <br />maintenance standards of the district established by Ordinances 155 and 1892. The <br />majority of shrubs and groundcovers have died and the lack of irrigation places stress <br />on the trees and reduces their ability to weather drought conditions. Without an increase <br />in assessments, the district may be at risk to fines or litigation. To limit liability for the <br />district, it will be necessary for the City to raise assessments to be consistent with the <br />approved formation document rates. <br />Funding from the increased assessment will allow the City to implement necessary <br />facility upgrades and improve maintenance, resulting in decreased liability. <br />For 2024-25 costs/revenues, see Figure 4 — FY 2024-25 Actual Costs and Revenues. <br />City of Pleasanton <br />Landscape Maintenance District No. 1994-1, Oak Tree Farm Engineer's Report, Fiscal Year 2025-26 <br />