My WebLink
|
Help
|
About
|
Sign Out
ITEM 16 ATT 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
081925 REGULAR
>
ITEM 16 ATT 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:19:10 PM
Creation date
8/6/2025 9:47:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br />ANNUAL CURB & GUTTER FOR STREET RESURFACING PROJECT <br />PROJECT NO. 25509 <br />THIS CONTRACT is made and entered into this day of , 20_ <br />by and between , ("Contractor"), whose address is <br />and telephone number is <br />and the CITY OF PLEASANTON, a municipal corporation ("City"). <br />WITNESSETH: <br />WHEREAS, the City has awarded to the Contractor a contract for ANNUAL <br />CURB & GUTTER FOR STREET RESURFACING PROJECT, PROJECT NO. <br />25509, <br />NOW, THEREFORE, in consideration of the mutual promises set forth herein, <br />the parties agree as follows: <br />1. Work to be Performed. The work will generally consist of- <br />The <br />fThe project replaces concrete in preparation for the City's annual resurfacing <br />program and will consist of, but is not limited to, replacing 51 pedestrian ramps, <br />approximately 3,500 square feet of sidewalk and driveways, 660 linear feet of <br />curb and gutter, 380 linear feet of median island curb, installation of 7 glue -down <br />ADA domes, and grinding the curb lip flush as well as associated work. <br />Said work is more particularly shown in the following documents which are on <br />file with the Public Works Department, Engineering Division of the City and are <br />incorporated herein by this reference: <br />A. Approved Plans and Specifications entitled the ANNUAL CURB <br />& GUTTER FOR STREET RESURFACING PROJECT, <br />PROJECT NO. 25509, and addenda thereto, if any. <br />B. Contract Change Orders approved by the City Engineer, done in <br />accordance with the Standard Specifications. <br />C. The elements of the proposal submitted to the City by the <br />Contractor, which the City has accepted. <br />2. Compensation. The City shall pay the Contractor for work actually performed at <br />the unit prices set out in the Contractor's proposal to the City as set forth in <br />Exhibit A of this agreement and incorporated herein. The quantities of work <br />stated therein are estimates only; actual quantities will be measured for payment <br />in accordance with the specifications. <br />3. Method of Pae. <br />Annual Curb & Gutter for Street Resurfacing Project, CIP No.25509 Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.